Winter Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: geek65

3V0-21.21 Advanced Design VMware vSphere 7.x Questions and Answers

Questions 4

The Chief Operating Officer (COO) at an organization raises concerns that their virtual infrastructure environment is vulnerable. Recently, a security-related issue with a virtual machine caused all management services to become unavailable. No budget is available in the short term for additional platform investment. An architect is asked to review the current environment and make recommendations to mitigate concerns.

A virtualization administrator has provided the following details:

  • There is a single four node cluster of ESXi servers
  • There are two, Layer 2, physical network switches connecting resources
  • The data center network is presented as a single /16 subnet

Given the information provided, which functional requirement should the architect include in the design to mitigate the COOs concerns?

Options:

A.

The virtual infrastructure environment must connect application virtual machines and management services to new physical network switches

B.

The virtual infrastructure environment must connect application virtual machines and management services to separate distributed virtual switches (DVS)

C.

The virtual infrastructure environment must connect application virtual machines and management services to separate VLANs

D.

The virtual infrastructure environment must connect management services to a vSphere standard switch (VSS)

Buy Now
Questions 5

In a meeting to discuss the minimum viable product (MVP) deployment of a new customer-facing application, the key stakeholder shares details of the application components and the application administrators share details of performance and integrity tests for the application.

The application will be made up of the following components:

  • A web server

-Steps to confirm the web server is operating correctly will take 15 minutes after the application server is online.

  • An application server

-Steps to confirm application server integrity will take 15 minutes after the database is online.

  • A database server

-The database server will be managed by a database administrator, with an agreed service-level agreement (SLA) to restore and validate database services within one hour.

The existing VMware infrastructure offers a recovery point objective (RPO) of 5 minutes and recovery time objective (RTO) of 15 minutes through a combination of backups and replication.

In the event of an outage impacting all three application components, how long will it take for the application to recover and complete all checks?

Options:

A.

15 minutes

B.

60 minutes

C.

105 minutes

D.

90 minutes

Buy Now
Questions 6

An architect is tasked with recommending a solution for a company that is running out of VLANs. Currently the company is running two separate data centers based on vSphere including an Enterprise Plus license. In the first data center, the problem was solved by using VMware NSX and overlay network. In the second data center, there is currently no VMware NSX implementation in place and no budget for additional licenses.

What should the architect recommend as a potential solution to provide support for additional VLANs?

Options:

A.

Separate Distributed Virtual Switches (DVS)

B.

Private VLANs (PVLAN)

C.

Virtual Guest Tagging (VGT)

D.

vSwitch VLAN Tagging (VST)

Buy Now
Questions 7

What is a benefit of using a scale-out method for handling vSphere cluster growth?

Options:

A.

An increase in the recovery time objective (RTO) for the cluster

B.

Faster to reach the limit of virtual machines per host

C.

An overall reduction in the license costs for the cluster

D.

Less potential impact to virtual machines during a single host failure

Buy Now
Questions 8

A architect is designing a new VMware software-designed data center (SDDC) using vSphere 7 to meet the following requirements:

  • The SDDC must be deployed at two locations: primary and secondary.
  • vSphere Replication must be used to replicate virtual machines between the two locations.
  • Site Recovery Manager must be used to orchestrate disaster recovery (DR) activities.
  • One single-sign on (SSO) domain must be used to authenticate access at both locations.

Which design decision should the architect make to meet these requirements?

Options:

A.

A vCenter Server Appliance will be deployed to each site. Unique SSO domains will be created per site.

B.

A vCenter Server will be installed on Windows virtual machines deployed to both sites.

C.

A vCenter Server Appliance will be deployed to each site.

D.

A vCenter Server Appliance will be deployed to the primary site only.

Buy Now
Questions 9

An architect is reviewing a physical storage design. The customer has specified that storage DRS will be used for ease of operational management for capacity and performance.

Which recommendation should the architect include in the design?

Options:

A.

Create smaller datastores to balance space with Storage DRS

B.

Use a larger number of storage profiles (varied disk speeds and RAID levels) to improve performance

C.

Create larger datastores to balance space with Storage DRS

D.

Create more datastores within each Storage DRS cluster to balance space and performance

Buy Now
Questions 10

Which two statements are true about gathering functional business and application requirements? (Choose two.)

Options:

A.

It focuses on functional requirements with C-level stakeholders

B.

It leverages a single set of QUESTION NO:s for all stakeholders

C.

It might require multiple rounds of stakeholder interviews

D.

It builds stakeholder consensus

E.

It is a non-iterative process

Buy Now
Questions 11

An architect is tasked with planning the design of a new vSphere environment. When commissioned, this environment will be used to migrate an existing set of virtual machines.

An inventory of the existing infrastructure, including configured vCPU, RAM and storage sizes has been provided.

In order for each virtual machine to be migrated, which two data sources with peak and average utilization data are required for sizing? (Choose two.)

Options:

A.

%Ready

B.

Disk Write latency

C.

CPU

D.

Ballooned memory

E.

IOPS

Buy Now
Questions 12

Which two of the listed requirements would be classified as manageability non-functional requirements? (Choose two.)

Options:

A.

ESXi clusters must scale when compute resources are sustained above 70% for five business days

B.

vSphere Fault Tolerance must be supported to improve application uptime

C.

ESXi host updates must be installed within one week of release

D.

The vSphere environment must support administrator password rotation

E.

ESXi clusters must scale to 500 concurrent virtual machines

Buy Now
Questions 13

An architect is tasked with designing a greenfield VMware software-defined data center (SDDC) solution that will be used to deliver a private cloud service for a customer.

During the initial meeting with the service owner and business sponsor, the customer has provided the following information to help inform the design:

  • The solution must support the concurrent running of 1,000 virtual machines
  • The production environment must be delivered across two geographically dispersed data centers All virtual machines must be capable of running in either data center.
  • The two data centers are currently connected to each other through a single but diversely routed, high bandwidth and low latency link.
  • The link between the two data centers is capable of supporting a round-trip time (RTT) of 150 ms The existing server hardware standard document states that all virtual infrastructure hosts must be deployed using vSAN ReadyNodes
  • The service owner has stated that it is critical to ensure the availability target of 99.9% All virtual machine backups must be completed using the existing backup service
  • The recovery time objective (RTO) for the service is five minutes
  • The recovery point objective (RPO) of the service is four hours

Which two elements represent risks to the successful delivery of this solution? (Choose two.)

Options:

A.

The use of only two data centers

B.

The network connectivity between data center sites

C.

The use of vSAN ReadyNodes

D.

The RTT on the link between the two data centers

E.

The use of the existing backup service

Buy Now
Questions 14

Which requirement would be classified as a functional requirement within the application design documentation?

Options:

A.

The application must be hosted with redundancy levels of N+1 or better.

B.

Penetration testing must be executed quarterly with a pass rate of 80% or higher.

C.

The application must be capable of handling 200 transactions per second.

D.

Administrators must monitor the network traffic of the desired systems.

Buy Now
Questions 15

The Chief Information Security Officer (CISO) for an organization is concerned about the security posture of the operating system images that are used for the provisioning of their Software-as-a-Service (SaaS) applications. The organization is in a growth period. The organization is opening a new data center to launch its next phase of new SaaS-based solutions.

The DevOps team currently creates encrypted virtual machine (VM) templates that are used for various operating systems and adds these to the vSphere inventory. The DevOps team already uses a published content library and has been granted a role with the ability to add and delete library items.

The following requirements have been noted:

  • Impacts to the DevOps team’s operational processes must be kept to a minimum.
  • The DevOps team must be able to regularly check out a copy of the image for updates and check in a new version of the image.
  • Images must be synchronized from the primary data center to the new data center.

Which three recommendations should the architect make to design a content library solution that will meet these requirements? (Choose three.)

Options:

A.

Clone virtual machines as VM templates to the published content library

B.

Create a subscribed library from the published library and synchronize Open Virtualization Format (OVF) templates on-demand

C.

Create a subscription and publish VM templates to a subscribed content library

D.

Create a subscribed library from the published library and synchronize Open Virtualization Format (OVF) templates automatically

E.

Clone virtual machines as Open Virtualization Format (OVF) templates to the published content library

F.

Update the role for the DevOps team with new privileges

Buy Now
Questions 16

An architect is tasked with designing a new VMware software-defined data center (SDDC) solution for an online retail customer who has a primary and secondary data center as well as 10 distribution hubs.

The customer has provided the following business requirements to help inform the design:

  • The solution must support the running of up to 1,000 concurrent virtual machines across the primary and secondary data center.
  • The solution must support the running of up to 20 concurrent virtual machines in each distribution hub.
  • The solution must support the separation of management and lines-of-business application virtual machines.
  • All management components (including directory services, backup, automation, operations and logging) must be deployed to the primary data center.
  • All virtual infrastructure components must have redundancy of N+1.
  • All sites are connected to each other using a wide area network that has multiple diversely routed links.
  • The solution should support a monthly uptime target of 99.9%.
  • The recovery time objective (RTO) for the solution must be four hours.
  • The recovery point objective (RPO) for the solution must be 24 hours.

Given the information from the customer, which assumption should the architect include in the design?

Options:

A.

All business application virtual machines can be deployed into a single cluster within the primary data center.

B.

Each distribution hub should be configured with a backup device.

C.

The wide area network has sufficient bandwidth to support centralized management.

D.

Each cluster will have a minimum of four hosts.

Buy Now
Questions 17

There is a request for approved virtual machine applications through a new vSphere platform’s integrated automation portal. The platform was built following all provided company security guidelines and has been assessed against Sarbanes-Oxley Act of 2002 (SOX) regulations.

The platform has the following characteristics:

  • vRealize Operations is being used to monitor all clusters.
  • There is a dedicated ESXi cluster, supporting all management services.

There is a dedicated ESXi cluster for all line-of-business applications.

  • Network traffic is serviced by NSX-T.

There is a dedicated ESXi cluster for virtual desktop infrastructure (VDI).

  • Network traffic is serviced by NSX-T.

The application owner is requesting approval to install a new service that must be protected as per the Payment Card Industry (PCI) Data Security Standard.

Which additional non-functional requirement should the architect include in the design to support the new service?

Options:

A.

The vSphere hosting platform and all PCI application virtual machines must be assessed against Payment Card Industry (PCI) Data Security Standard compliance.

B.

The vSphere hosting platform and all PCI application virtual machines must be assessed for SOX compliance.

C.

The vSphere hosting platform and all PCI application virtual machine network traffic must be routed via NSX-T.

D.

The vSphere hosting platform and all PCI application virtual machines must be monitored using the vRealize Operations Compliance Pack for Payment Card Industry.

Buy Now
Questions 18

A VMware Service Provider is tasked with delivering a solution for continuous availability for a subset of Tier 1 virtual machines (VMs) and vApps running in their vSAN environment. The VMs make up a mission-critical application and there can be no data loss in the event of an outage at their primary data center. In the event of a regional outage, they have established a 10-minute recovery point objective (RPO). Failover/failback to the third site must be automated.

They have the following in place:

  • Two local data centers (primary and secondary) connected with 100 Gb dedicated fiber
  • uk.co.certification.simulator.questionpool.PList@195eb6c0

A third data center located on another power grid

  • 70ms latency between the primary and secondary data centers
  • Matching storage arrays at all locations

Which two solutions could be used to meet the requirements? (Choose two.)

Options:

A.

Site Recovery Manager

B.

Snapshots

C.

vSAN Metro Cluster

D.

vSphere Data Protection

E.

vStorage APIs for Array Integration (VAAI)

Buy Now
Questions 19

A new vSphere platform is being created. The platform will host virtual machines that will run management services and line-of-business applications.

What should the architect consider when designing the number and type of clusters required?

Options:

A.

Maximum tolerable downtime

B.

Predicted platform growth

C.

Auditing requirements for the virtual machines

D.

The level of isolation required between virtual machine classifications

Buy Now
Questions 20

Refer to the exhibit.

During a requirements gathering workshop, a customer shares the following diagram regarding their availability service-level agreements (SLAs):

The customer states that there is no application level availability for legacy applications.

Which recommendation could the architect make to meet the customer’s high availability requirements for the legacy applications virtual machines?

Options:

A.

Enable vSphere HA and add a VM Override with VM Restart Priority set to Disabled

B.

Enable Fault Tolerance

C.

Achieve application availability with snapshots

D.

Enable vSphere HA and add a VM Override with VM Restart Priority set to Lowest

Buy Now
Questions 21

An architect is designing a new greenfield environment that will install ESXi on local disks. There is a requirement to streamline initial and future installations of ESXi hosts.

Which configuration option should the architect recommend for installing ESXi hosts to meet these requirements?

Options:

A.

Installation with kick start script

B.

Auto Deploy with stateless caching mode

C.

Manual installation using boot from SAN

D.

Auto Deploy with stateful install mode

Buy Now
Questions 22

An architect is considering placement of virtual machines within an existing VMware software-defined data center (SDDC).

During the discovery phase, the following information is documented:

Cluster One

  • Six ESXi hosts
  • vSphere HA with host failures cluster tolerates = 1
  • Proactive HA is enabled and set to automated
  • Fully Automated vSphere DRS
  • Transparent Page Sharing (TPS) is enabled

Cluster Two

  • Eight ESXi hosts
  • vSphere HA with host failures cluster tolerates = 1
  • Proactive HA is disabled
  • Partially Automated vSphere DRS
  • Transparent Page Sharing (TPS) is disabled

Cluster Three

  • Three ESXi hosts
  • vSphere HA with admission control is disabled
  • Proactive HA is not supported
  • Transparent Page Sharing (TPS) is disabled

Virtual Machine Resource Profile 1

  • Memory sharing techniques should not be used
  • Virtual machines should be automatically restarted in the event of host failure if resources are available
  • Automated initial virtual machine placement

Virtual Machine Resource Profile 2

  • Memory sharing techniques should not be used
  • Virtual machines should be automatically restarted in the event of host failure regardless of available resources
  • Automated initial virtual machine placement

Which two recommendations should the architect make for placement of the virtual machines to meet resource profile requirements? (Choose two.)

Options:

A.

All virtual machines matching Virtual Machine Resource Profile 2 should be placed on Cluster One.

B.

All virtual machines matching Virtual Machine Resource Profile 1 should be placed on Cluster One.

C.

All virtual machines matching Virtual Machine Resource Profile 2 should be placed on Cluster Two.

D.

All virtual machines matching Virtual Machine Resource Profile 1 should be placed on Cluster Two.

E.

All virtual machines matching Virtual Machine Resource Profile 2 should be placed on Cluster Three.

Buy Now
Questions 23

The storage team at an organization is planning to migrate from an older Fibre Channel storage environment to a new environment using IP-based storage.

Which two switch features or characteristics are appropriate for IP storage networks? (Choose two.)

Options:

A.

Fabric extending devices

B.

Spanning Tree Protocol (STP)

C.

2:1 or greater bandwidth oversubscription for 10 GbE switches

D.

Non-blocking switch

E.

Deep or ultra buffered switches

Buy Now
Questions 24

An architect is tasked with designing a greenfield VMware software-defined data center (SDDC) solution that will be used to deliver a private cloud service for a customer.

During the initial meeting with the service owner and business sponsor, the customer has provided the following information to help inform the design:

  • The solution must initially support the concurrent running of 300 production and 600 development virtual machines.
  • The production environment should be delivered across two geographically dispersed data centers. The development environment must be vSphere-based but does not have to be deployed on-premises.
  • The two data centers are connected to each other through multiple diversely routed, high bandwidth and low latency links.
  • The customer’s server hardware standard document states that all virtual infrastructure hosts must be based on blade architecture only.
  • The service owner has said that is important to ensure that neither the availability target of 99.5% nor the resource capacity is affected when the operations team completes maintenance activities, such as the monthly software patching and ad-hoc hardware break/fix.
  • All virtual machine backups must be completed using the existing backup service. The recovery time objective (RTO) for the service is four hours.
  • The recovery point objective (RPO) of the service is 24 hours.

Given the information from the customer, which two would be classified as assumptions within the design? (Choose two.)

Options:

A.

The backup service will store data in a secure facility

B.

The backup service has sufficient capacity for the new requirements

C.

The customer will update their hardware standard to support rack mount servers

D.

All virtual machines will be deployed with the same resource profile for production and development

E.

The clusters will have a minimum redundancy of N+1

Buy Now
Questions 25

An architect is reviewing a physical storage design. The customer has specified that a new active-passive based storage array will be used to provide storage for the vSphere clusters.

Which configuration should for the architect recommended?

Options:

A.

VMW_SATP_LOCAL

B.

VMW_PSP_MRU

C.

VMW_SATP_DEFAULT_AA

D.

VMW_PSP_FIXED

Buy Now
Questions 26

During a requirements gathering workshop to design a physical to virtual migration, the customer provides the following information:

  • There is no physical firewall in the data center with no anticipated plans for a future network refresh.
  • Leveraging the virtual infrastructure to mitigate the lack of network security must be addressed in the design.
  • All physical servers to be migrated exist on the same VLAN.

Which recommendation should the architect make to address the customer requirement with regard to virtual networking?

Options:

A.

Split the virtual machines into several VLANs

Use tag actions

B.

Create port groups with different names and same VLAN IDs

Enable traffic shaping for ingress and egress traffic

C.

Enable traffic filtering and marking

Use allow or drop actions

D.

Disable traffic filtering and marking Use tag actions

Buy Now
Exam Code: 3V0-21.21
Exam Name: Advanced Design VMware vSphere 7.x
Last Update: Nov 21, 2024
Questions: 88
3V0-21.21 pdf

3V0-21.21 PDF

$28  $80
3V0-21.21 Engine

3V0-21.21 Testing Engine

$33.25  $95
3V0-21.21 PDF + Engine

3V0-21.21 PDF + Testing Engine

$45.5  $130