View the extract of a permission scheme shown below.

Which two statements are correct? (Choose two.)

Options:

A.

Users in the project role Administrators can update components and versions.

B.

Users must be in either the jira-software-users group or the Users project role to delete issues.

C.

All logged in users can create issues.

D.

Users must be in both in the jira-software-users group and the Users project role to delete issues.

E.

Users can edit issues only if they have a valid Jira Core license.

Buy Now
Questions 5

View the extract of a Jira Software Scrum project's permission scheme shown.

The project uses a simplified workflow.

Who can drag and drop issues to the Closed column on the board?

Options:

A.

only the board administrator

B.

any user with Jira Software application access

C.

nobody

D.

any logged in user

E.

only members of the Administrators project role

Buy Now
Questions 6

Teresa is able to see the Start Progress transition but not the Approve transition on an issue. Her co-worker is able to see both.

Identify two possible causes why Teresa can NOT see the Approve transition. (Choose two.)

Options:

A.

Teresa is not listed in the correct security level for the issue.

B.

Teresa does not have the Transition Issues permission.

C.

Teresa is not in the correct group or project role.

D.

Teresa does not meet the condition on the Approve transition.

E.

Teresa does not have the correct global permission.

F.

Teresa does not have the correct Application access.

Buy Now
Questions 7

A user approaches you with a problem.

She cannot see or edit the Priority system field on any of the screens of a Process Management project.

What explains the problem?

Options:

A.

The field does not have the correct configuration context.

B.

She is not listed in the priority scheme.

C.

The field is hidden in the field configuration.

D.

The field is not available for this project template.

E.

She does not have the correct permission.

Buy Now
Questions 8

Martina is unable to perform the following actions in the App project:

  • Create and manage versions
  • Create and manage components
  • Rank issues in the backlog

The App project does not use a shared permission scheme.

Which two permissions will allow her to perform those actions? (Choose two.)

Options:

A.

Transition Issues

B.

Move Issues

C.

Administer Projects

D.

Bulk Change

E.

Schedule Issues

Buy Now
Questions 9

Users typically forget to add components when they create new issues. As a result, most of the newly created issues get assigned to Tom, who is the project lead.

Tom reviews all of the issues, and wants to triage them based on component selection. But when he edits an issue and adds a component, the assignee does not change.

Why does the assignee not change when adding a component to an issue?

Options:

A.

Auto-assignment with components only works when creating issues.

B.

The project's default assignee overwrites the value of the component lead.

C.

The default assignee of the selected components is set to Project default.

D.

The Assignee field additionally needs to be changed to Automatic.

E.

The selected components do not have a component lead set.

Buy Now
Exam Code: ACP-600
Exam Name: Project Administration in Jira Server
Last Update: Nov 23, 2024
Questions: 65
ACP-600 pdf

ACP-600 PDF

$59.7  $199
ACP-600 Engine

ACP-600 Testing Engine

$67.5  $225
ACP-600 PDF + Engine

ACP-600 PDF + Testing Engine

$74.7  $249