API-580 API 580 - Risk Based Inspection Questions and Answers

Questions 4

Corrosion, cracking, and mechanical are all examples of what?

Options:

A.

Leaks

B.

Failure modes

C.

Failure mechanisms

D.

Damage mechanisms

Buy Now
Questions 5

In quantitative POF analysis, when failure data for each piece of equipment is unavailable, general industry failure data can be used by what means?

Options:

A.

Using engineering judgment to estimate the POF categories

B.

Adjusting the data by qualified persons to make it more equipment specific

C.

Multiplying it by numerical fractions obtained from applicable industry literature

D.

Categorizing the probability of failure as high, medium or low with different orders of magnitude

Buy Now
Questions 6

RBI analysis requires a team approach primarily because:

Options:

A.

risk may be assessed differently for each equipment item.

B.

different levels of experience are essential to the process.

C.

maintenance and engineering must be involved in addition to inspection.

D.

one person typically does not have the background or skills to perform the entire analysis.

Buy Now
Questions 7

Who shall be responsible for assessing the types of damage mechanisms and their applicability and severity to the equipment?

Options:

A.

The risk analyst leading the team

B.

The RBI assessment team

C.

A corrosion specialist

D.

The inspector or inspection specialist

Buy Now
Questions 8

Clearly documenting the key assumptions made during an RBI assessment will:

Options:

A.

quantify the level of acceptable risk.

B.

identify the level of residual risk.

C.

allow recreation at a later date.

D.

demonstrate the precision of the assessment.

Buy Now
Questions 9

Which of the following may make it impractical to reduce some risks to an acceptable level?

Options:

A.

Technology

B.

Labor contracts

C.

Production needs

D.

Regulatory requirements

Buy Now
Questions 10

The governing inspection codes (such as API 510 and API 570) and jurisdictional regulations, if any, shall be reviewed to determine what?

Options:

A.

A default maximum time periods for RBI reassessments

B.

When the next turnaround must be scheduled

C.

If the risk of continued operation is acceptable

D.

When equipment that is deteriorating must be replaced

Buy Now
Questions 11

Risk evaluation is defined as the process used to:

Options:

A.

find, list, and characterize elements of risk.

B.

select and implement measures to modify risk.

C.

compare estimated risk against given risk criteria.

D.

assign values to the probability and consequence of risk.

Buy Now
Questions 12

The RBI process is capable of generating a comparative ranking based on:

Options:

A.

relative risk.

B.

absolute risk.

C.

general risk.

D.

specific risk.

Buy Now
Questions 13

In RBI analysis, dividing process units into groups of equipment that have common characteristics is:

Options:

A.

not permitted unless equipment is in identical service.

B.

useful only for common types of equipment.

C.

to be avoided because every equipment item is unique.

D.

useful as a means of screening together and saving time.

Buy Now
Questions 14

What is one goal of a risk matrix or risk plot?

Options:

A.

To understand how consequence and probability of risk varies between different levels of risk

B.

To communicate the results of a risk assessment in a common format that a variety of people can understand

C.

To show ISO-risk lines and boxes on a matrix and determine which risks are acceptable and which are not

D.

To determine what level of risk is acceptable to management based on consequence and probability of failure

Buy Now
Questions 15

In RBI, operating conditions that should be considered include:

Options:

A.

emergency shutdown and start-up

B.

only those that could cause significant leaks

C.

idle or out of service time

D.

upset conditions

E.

all possible operating conditions, even if unlikely

F.

those considered an “act of God.”

Buy Now
Questions 16

Detailed information and data are needed for quantitative RBI in order to:

Options:

A.

make use of logic and physical models.

B.

conduct sensitivity analysis in probability models.

C.

improve the risk rank of an item.

D.

assess the higher risks associated with the release of hazardous fluids.

Buy Now
Questions 17

Probability of failure analysis shall address:

Options:

A.

causes of failure such as operator errors, PMI inaccuracies, and design flaws.

B.

only the damage mechanism that is most likely to cause failure.

C.

situations in which equipment is susceptible to multiple damage mechanisms.

D.

all damage mechanisms that may be present at a site.

Buy Now
Questions 18

"Risk" is defined as the combination of the:

Options:

A.

probability of consequences from a failure event.

B.

probability of an event and its consequences.

C.

failure, loss of containment, and probability of ignition and/or injury.

D.

probability of failure from identified deterioration mechanisms and subsequent event.

Buy Now
Questions 19

In the data collection stage, an assessment of what information is generally necessary?

Options:

A.

The type of RBI assessment that will be applied to the project

B.

The codes and standards in use for in-service inspection and evaluation

C.

What other types of risk assessment and mitigation have been applied to the equipment

D.

The risk thresholds that will be used to determine acceptable vs. unacceptable risks

Buy Now
Questions 20

What program is used when damage mechanisms are precipitated by short-term, event-driven operating changes?

Options:

A.

Integrity Operating Windows

B.

Process Hazards Analysis

C.

Process Safety Management

D.

Risk-Based Inspection

Buy Now
Questions 21

RBI as a risk-based approach focuses attention specifically on:

Options:

A.

the equipment and associated damage mechanisms.

B.

on-stream inspections in lieu of internal inspections.

C.

inspection intervals based on a percentage of equipment life.

D.

consequence-based inspection intervals.

Buy Now
Questions 22

Which of the following codes provide requirements and limitations for implementing RBI programs? (Select all that apply)

Options:

A.

API 653

B.

API 573

C.

API 570

D.

API 510

E.

API 578

Buy Now
Questions 23

With regard to initial assumptions in an RBI analysis, which of the following statements is correct?

Options:

A.

Consequence and probability estimates that are too conservative can result in unnecessarily inflated calculated risks.

B.

Consequence and probability estimates that are more conservative will result in less-intrusive inspections.

C.

Conservative consequence and probability estimates will be necessary to meet regulatory requirements.

D.

Conservative consequence and probability estimates result in fewer mitigation needs.

Buy Now
Questions 24

An RBI assessment of new equipment or a new project may:

Options:

A.

not be useful because there is no inspection history.

B.

be needed in order to define the risk criteria to be used in service.

C.

be conducted only after 1000 hours of operation to establish operating and inspection data.

D.

yield useful information on potential future risks.

Buy Now
Questions 25

When equipment has deteriorated to such an extent that the risk of failure cannot be managed and held to an acceptable level, often the only way to mitigate risk is to:

Options:

A.

repair/replace the equipment.

B.

perform a fitness-for-service analysis.

C.

shorten the inspection interval.

D.

rerate the equipment.

Buy Now
Questions 26

In RBI, residual risk factors for loss of containment include:

Options:

A.

human error.

B.

maintenance plans.

C.

unknown or unanticipated damage mechanisms.

D.

secondary effects from nearby units.

E.

change of ownership.

Buy Now
Questions 27

How important is data quality in RBI assessment?

Options:

A.

Equally important for all types

B.

Most important for quantities

C.

Most important for qualitative RBI

D.

Not as important in qualitative RBI

Buy Now
Exam Code: API-580
Exam Name: API 580 - Risk Based Inspection
Last Update: May 8, 2025
Questions: 90
API-580 pdf

API-580 PDF

$29.75  $84.99
API-580 Engine

API-580 Testing Engine

$35  $99.99
API-580 PDF + Engine

API-580 PDF + Testing Engine

$47.25  $134.99