You want to insert an operatio at a certain time on work center. The planning direction is forward. The disired dispatching time concides with an operation that has previously been dispatched. How does the insertion take place?
Which of the following is valid sequence of the main activities in production order processing?
Where do you maintain the work center that represents the production line for repetitive manufacturing?
You use planning strategy Finite Scheduling - with Reverse adn want to allow scheduling in the past. How can you achive this?
In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?
An issue storage location was NOT found through the work center, bill of material(BOM) item, or material master. What determines whether the storage location can be derived from the production version?
When can the automatic material availability check occur in a production order?