Questions 4

Which business processes are affected by settings in the order-type-dependent parameters?

Note: There are 2 correct answers to this question.

Options:

A.

Check material availability.

B.

Schedule production orders.

C.

Define integration with cost accounting.

D.

Select master data.

Buy Now
Questions 5

which of the following automation options can you use for production orders? Note: There are 2 Correct answers to this question?

Options:

A.

you can use mass processing to set production orders to technically complete

B.

you can use the production scheduling profile to automatically set orders toI technically complete

C.

You can use trigger points to automatically create rework orders via confirmation.

D.

You can use mass processing to read PP master data for production orders

Buy Now
Questions 6

Which of the following elements does MRP take into account during net requirement

calculation? Note:

There are 2 correct answers to this question.

Options:

A.

Forecast key figures

B.

Safety Stock

C.

Maximum stock level

D.

Purchase orders

Buy Now
Questions 7

Where do you maintain the work center that represents the production line for repetitive manufacturing?

Note: There are 2 correct answers to this question

Options:

A.

Production cost collector

B.

Repetitive manufacturing profile

C.

Routing

D.

Production version

Buy Now
Questions 8

in your Plant, MRP is activated.

which options do you have to exclude a material from the MRP run?

Note: there are 2 correct answers to this question.

Options:

A.

Use a specific material status

B.

Use a specific material group

C.

Use a specific MRP type

D.

Use a specific MRP list

Buy Now
Questions 9

What time element of midpoint scheduled operations can be reduced by reduction strategy settings while dispatching? Note: There are 2 correct answers to this question

Options:

A.

Queue

B.

Teardown time

C.

Move time

D.

Setup Time

Buy Now
Questions 10

What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?

Options:

A.

The planned order is converted to a production order.

B.

The planned order's component availability is checked.

C.

The planned order generates capacity requirements

D.

The planned order's components are copied to the picking list.

Buy Now
Questions 11

What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question.

Options:

A.

Scheduling agreement schedule line

B.

Purchase Order

C.

Planned Order

D.

Production Order

Buy Now
Questions 12

What data can you maintain in the subitems of a bill of material (BOM)?

Note: There are 2 correct answers to this question.

Options:

A.

Installation point

B.

Item type

C.

Quantity

D.

Scrap percentage

Buy Now
Questions 13

How can you set up a material as a phantom assembly?

Note: There are 2 correct answers to this question

Options:

A.

Define the special procurement type inside the material master.

B.

Change the item category of the phantom assembly in the bill of material •—' (BOM)

C.

Define the special procurement type inside the BOM

D.

Change the phantom item indicator for the phantom assembly in the bill of material (BOM)

Buy Now
Questions 14

Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program. Which planning strategy do you use?

Options:

A.

Make-to-stock production (10)

B.

Planning with final assembly (40)

C.

Make-to-stock production (20)

D.

Planning without final assembly (50)

Buy Now
Questions 15

What is the purpose of a reporting point confirmation in repetitive manufacturing?

Note: There are 2 Correct answers to this question?

Options:

A.

To determine the work in progress along the production line

B.

To provide timely updates of inventory management for the staged components

C.

To reduce the total production lead time for a long production line

D.

To stage different components for a production line simultaneously

Buy Now
Questions 16

How can you set up the supply source for the Kanban process in SAP S/4HANA?

Note: There are 3 correct answers to this question.

Options:

A.

Use stock transfer reservations for stock transfer.

B.

Use purchase orders for external procurement.

C.

Use quotations for internal and external procurement

D.

Use run schedule quantities for in-house production.

E.

Use purchasing costs for automated source prioritization.

Buy Now
Questions 17

What are the options if the Dispatched operation status is set for a production order operation?

Note: There are 2 correct answers to this question.

Options:

A.

You can reschedule the operation using finite scheduling in a planning table.

B.

You can reschedule the operation in the Manage Production Operations app.

C.

You can reschedule the operation using infinite scheduling in a planning table

D.

You can reschedule the operation using midpoint scheduling in a planning table.

Buy Now
Questions 18

Your project team decided to use a make-to-order planning strategy material in discrete manufacturing.

what is the impact of this decision?

Note: there are 2 correct answers to this question

Options:

A.

Storage Location MRP areas are required for sales-orders-specific stock.

B.

Net requirement calculation is carried out for every sales order individually.

C.

Both the reduction of make-to-order stock and requirements occur on delivery

D.

Sales orders have to be ATP-confirmed (available-to-promise) to saved.

E.

Production orders are created with sales order reference.

Buy Now
Questions 19

Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA.

Note: there are 2 correct answers to this question.

Options:

A.

Manual maintenance

B.

100% check

C.

First in First out (FIFO).

D.

Simultaneous

Buy Now
Questions 20

How can you support a GMP (Good Manufacturing Practice)-compliant production process?

Note: There are 3 correct answers to this question.

Options:

A.

Approved resources

B.

Digital signature

C.

Batch record

D.

GMP-compliant flag

E.

Recipe approval

Buy Now
Questions 21

Which standard item categories can you select inside a bill of material (BOM)?

Note: There are 2 correct answers to this question

Options:

A.

Work item

B.

Variable-size item

C.

Non-stock item

D.

WBS item

Buy Now
Questions 22

Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.

Options:

A.

Move Time

B.

Pick/pack time

C.

Setup time

D.

Float before production

E.

Queue time

Buy Now
Questions 23

Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA. When can you use mode selection?

Options:

A.

When multiple production versions are maintained for one product

B.

When multiple operations are maintained for one product

C.

When alternative resources are used within one operation

D.

When multiple planned orders exist on one resource

Buy Now
Questions 24

Your company manufactures materials whose specifications differ for each manufacturing process. Which application do you have to use in SAP S/4HANA to be able to track and use this information in all areas of logistics?

Options:

A.

Engineering change management

B.

Quality management

C.

Process order management

D.

Batch management

Buy Now
Exam Code: C_TS422_2022
Exam Name: SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing
Last Update: Dec 3, 2024
Questions: 80
C_TS422_2022 pdf

C_TS422_2022 PDF

$29.75  $84.99
C_TS422_2022 Engine

C_TS422_2022 Testing Engine

$35  $99.99
C_TS422_2022 PDF + Engine

C_TS422_2022 PDF + Testing Engine

$47.25  $134.99