A business analyst wants to host a brainstorming session with eight key stakeholders. In preparation for this event, the business analyst should designate which one of the following rules for the session?
Sam is preparing for the task of prioritizing requirements and he'll need five inputs to accomplish the task. Which one of the following is not an input that Sam will use to prioritize requirements?
You're organizing the business analysis approach for your organization. Jane wants to know when changes to requirements are most likely to happen in business analysis processes. Which one of the following statements best describes when changes to requirements may happen?
There are three inputs for stakeholder analysis. Which input describes the existing organizational units and their interactions with one another?
Which of the following defines all of the features and functions of the thing, solution, or service the project or organization will create?
You are the business analyst for your organization and you're preparing to elicit requirements from the stakeholders. You've gathered several inputs to help with the elicitation process. Which input(s) will be used to ensure that you understand the type of information that should be elicited from the stakeholders?
You are the business analyst for your organization. You're considering if you should make a solution or purchase it from a vendor. If your team creates the solution, it will cost $286,000 and will cost $2,400 per month to support. The vendor's solution, however, will cost $239,000 and will cost $2,850 per month to support. How long will you need to use your in-house solution to be more cost effective than the vendor's proposed solution?
You are the business analyst for a large project for your organization. Your project has 65 stakeholders and this will greatly increase the complexity of the communication in this project. To demonstrate how complex this project and its communication will be, you show the management the number of communication channels in this project. How many channels exist in this project based on the number of stakeholders?
You are a Business Analyst for your organization, and you're preparing to elicit requirements from stakeholders. You've gathered several inputs to help with the elicitation process. Which input will you use to ensure that you understand the type of information that should be elicited from stakeholders?
A business analyst is studying the cost of the endeavor in relation to the projected income the endeavor will bring once the project is completed. What financial valuation technique can the business analyst use to determine the breakeven point for the project?
You are the business analyst for your organization. You've believed that your solution can actually be purchased from outside vendor rather than trying to create the solution internally. You decide to ask the vendor to provide a fee for their services based on the statement of work. What document will you give the vendor along with the statement of work?
As a candidate for CCBA, you should be able to recognize the activities associated with each knowledge area. Which of the following is an elicitation process that is a part of job observation?
Robert is the business analyst for his organization and is preparing to host a workshop for twenty stakeholders. The goal of this workshop is to comprehensively identify the requirements for newsoftware that will be created for Robert's organization. What must first be established in the workshop to ensure that the elicitation process moves smoothly?
You are the business analyst for your organization and you're working with Adam on business analysis processes. Adam allows the business analysis activities and resources to exist in support of the organization. Of the following, what type of business analysis stakeholder is Adam?
The business need is considered to be the most critical step in the business analysis effort. Why is the definition of the business need considered the most critical step?
Mark is the business analyst for his organization. He is working with the solution development team and he believes that the team does not want to implement a certain portion of the requirements. The team is expressing the difficulty of the requirements and how it will be extremely challenging to complete. When Mark asks about a similar project that the team completed, they insist that this is a different type of requirements though Mark believes that it is not. What is the solution development team appearing to do to the requirements?
Which one of the following statements best describes the purpose of allocating requirements?
The creative thinking process has three values to determine the effectiveness of the process. Which one of the following is not a measurement of effective creative thinking?
You are the business analyst for your organization and you are working with Bill on creating a model. Bill is a little confused about all the different things a model can do for the stakeholders. You explain to Bill that a model can do all of the following except for which one?
A business analyst (BA) is structuring requirements to ensure they are cohesive and tell the full story. Which of the following requirements is consistent with a stakeholder's need: “As a Product Manager, I want to review my general insurance sales performance so I track my sales performance against my annual target”?
A global organization is implementing a new Knowledge Management System and communication to the different regions has been informal. The approach is to convert the few remaining regions iteratively. The team has experienced variances at this point but feels confident in these final conversions. How should the business analyst (BA) communicate the information?
A business analyst (BA) has been asked to develop a plan to complete the associated business analysis activities for a project in which an organization is switching from a manual to an automated process for receiving payments. As the final step in developing the plan, which technique will the BA use?
Anne is the business analyst for her organization and she's creating a textual requirement for her analysis. As part of the textual requirements, there are specific rules that Anne should follow. Textual requirements must always address what three things in regard to the requirements?
A business analyst has identified four different solutions for a business need. In the light of solution assessment, how many solution assessment iterations should he do?
You have been assigned as the Project Manager for a new project that involves the development of a new interface for your existing time management system. You would like to plan the communications that need to be made during the project lifecycle. Which of the following would be a critical tool/technique to help in your communications planning?
You are the business analyst for your organization and you're creating a business analysis communication management plan. In your plan, you want to address the different locales and culture and the communication needs that may affect the business analysis approach. Which one of the following elements should not be included in the cultural analysis of the plan?
You are the business analyst for an organization and you're managing your stakeholders through the requirements validation activities. Your stakeholders are categorized by executives, functional managers, directors, end users, and customers. Which of these stakeholders are involved in the requirements validation
activities?
High quality requirements have certain characteristics which distinguish them from low-quality requirements. Which characteristic of requirements demands that all requirements in a set or model support its overall purpose and scope?
You are the business analyst for your organization and you're training Marcy, a new business analyst, on how requirements are defined. Which one of the following best describes how requirements are defined?
Complete this sentence. If a requirement cannot be verified, it cannot be successfully.
One of the techniques to assess capabilities in an organization is to use SWOT. What does SWOT accomplish?
You work as a project manager for SoftTech Inc. You are working with the project stakeholders to begin the qualitative risk analysis process. You will need all of the following as inputs to the qualitative risk analysis process except for which one?
Henry is a business analyst in his organization and he's asked an expert to help him determine the best business analysis duties to implement. Why would Henry ask an expert to help him define the business analysis duties?
A facilities management company has an ambitious growth plan of doubling the revenue of their office waste recycling service over the next 12 months. The business analyst (BA) plans to define the objectives and align them with the enterprise's vision, mission and goals. What element of ‘SMART’ goals would this objective refer to?
Ralph is a business analyst for his organization and he's using the plan-driven approach for business analysis. Ralph has captured the requirements of the project, but what must happen before he can begin capturing and defining the requirements at a deeper level of detail?
As a candidate for CCBA, you should be able to recognize the activities associated with each knowledge area. Which of the following are business analysis planning and monitoring activities? Each correct answer represents a complete solution.
During a project to replace an existing system, requirements for new functionality were elicited. Upon further investigation, additional types of requirements related to other features and characteristics were also identified. What can facilitate effectively understanding the different types of requirements?
Requirements have been prioritized in the product backlog for inclusion in the upcoming release. One of the project team members fears that at least one requirement from the prioritization list is not finalized and still requires further analysis. Which of the following factors describe the affected requirement?
A new payments system was recently implemented to replace an old legacy system. The system users have lodged a complaint that the new system is slower than the old system but system performance statistics show more efficiency. How does the business analyst (BA) demonstrate to users how the new system is performing?
A business analyst (BA) is tasked with developing requirements that can be implemented by the development team iteratively. Which characteristic should the requirements exhibit?
A business analyst (BA) has elicited requirements for a new system. A subset of these requirements refers to judging the performance of the system, such as efficiency, capacity, security, and scalability. What technique is used to examine and group these requirements?
There are three inputs needed to determine the solution approach process. What are these inputs?
Which of the following approaches describes the project management approach of refining requirements and project scope?
Which one of the following is not a general technique that a business analyst may use in the requirements verification task?
Henry is meeting with Janet, the business analyst of the organization. They are discussing an opportunity to create a new service their company can provide, though the startup of the service would take time and an investment. Henry wants Janet to explore the possibility of this new venture. What activity is Henry asking Janet to complete?
Which one of the following terms is not a business analysis planning and monitoring approach?
All of the following are inputs to the task assess organizational readiness except for which one?
Wanda is the business analyst for her organization and she is currently working on the specify and model requirements process. One of the elements of this process is the documentation of the textual requirements. Wanda must describe the capabilities of the solution, any conditions that must exist for the requirements to operate, and what third component of the textual requirement?
You are the business analyst for your organization. You are identifying new opportunities to improve upon your existing web services. Management is open to new opportunities as long as the changes do not take more than 60 days to implement. What type of a factor does the 60-day implementation represent?
You are the business analyst for your organization and management has asked you to select a model for your solution. Management wants you to describe the people within and without of your organization who will interact with the solution. What type of model has management asked you to create?
Which of the following is used to define and document the business analysis approach?
There are four methods to generate the business need in an organization. Which approach is described as the need to achieve a strategic goal?
If you're a business analyst and using an event-based elicitation task, such as a requirements workshop, what can be considered as essential to establish with the participants?
There are four inputs to the plan business analysis activities. Which one of the following is not an input to the plan business analysis activities process?
Linda works as a project manager for an IT project. She is getting new developers for completing her project. Which of the following processes is she involved in?
What does the decomposition of activities and tasks based on the work breakdown structure create for the business analyst?
You are the business analyst for your organization and you're training Marcy, a new business analyst, on how requirements are formed. Which one of the following best describes how requirements are formed?
A project is initiated to create new financial reports for the accounting department, and the accountants have a wide range of views as to what would serve them best. What should the business analyst (BA) do to develop the correct set of requirements?
A business analyst (BA) is examining the relationships between elicited requirements on a project. What quality criteria must be satisfied when the BA is defining requirements relationships?
A Chief Information Officer (CIO) was discussing a solution approach for a technology project in a meeting where a business analyst (BA) was also present. Stakeholders were discussing advantages and disadvantages of each solution approach. What should be the top priority for the BA in assessing the solution approach?
The business analyst (BA) has structured information so it is easy to find, does not conflict with other information, and is not duplicated unnecessarily. Which additional factor does the BA need to take into account when deciding how to structure the information?
A business analyst (BA) is given an additional requirement near the end of the development phase that needs to be incorporated into the system as part of the same release. In this situation, the first activity the BA performs to understand the effect of the proposed change is to:
After an initial project kick-off meeting, the business analyst (BA) determined that the project has a short deadline and a regulatory mandate with stiff penalties for non-compliance. The stakeholders do not want to risk missing the deadline, and management is willing to commit any amount of resources to meet the deadline. Which kind of approach is suitable for the initiative?
A new Chief Executive Officer (CEO) is appointed to revive a chain of well-recognized superstores. The CEO wants to increase sales by introducing on-line shopping. Most stores are understaffed and maintenance is a challenge. Which of the following would be
considered an asset?
A business analyst (BA) has spent the week conducting work sessions with a project's key stakeholders. Together, they have been reviewing user requirements and high-level design flowcharts to ensure that they have been correctly defined and documented. Which of the following describes the purpose of their work?
The Chief Executive Officer (CEO) is concerned about how two client bases are going to be integrated and serviced in the newly formed company after a merger. A project has been initiated to implement a Customer Relationship Management (CRM) system for the new company that will contain the client information from both companies. What must the business analyst (BA) do to address the concerns of the CEO?
A change to support a regulatory requirement is proposed for inclusion in the scope of a project. A business analyst (BA) conducts an impact analysis to determine the extent of the change. What previous task could assist the BA in performing the impact analysis?
A business analyst (BA) has set up a number of elicitation workshops with key subject matter experts (SMEs) on a new project. All SMEs have accepted the workshop invitations except for the legal SME who has not responded to any invitations. The first workshop is scheduled for next week and the BA has tried unsuccessfully to reach the legal SME by phone. How should the BA proceed?
A project manager (PM) is planning the project timelines along with a business analyst (BA) and they come across the task of requirement allocation. The PM wants to know what the dependencies are before the requirement allocation task is initiated and seeks the BA's advice. Which of the following is a dependency that the BA will highlight as a predecessor for requirement allocation?
A project is being initiated to enhance an on-line product because sales have declined for over a year. The company leader’s ant confident that all of the skills needed to improve the product exist within the company. By enhancing the product, sales will increase and new customers will emerge. A business analyst (BA) will help the enhancement project by first:
Two stakeholders are arguing over which model to use for describing requirements. One insists that using an activity diagram is superior while the other prefers a state diagram. How should the business analyst (BA) resolve the conflict?
A business analyst (BA) is tasked with performing a gap analysis between two existing systems to combine into a single system or run just one system. Which of the following modelling formats will show the requirements for both systems side by side?
A stakeholder has requested an extremely detailed resolution to an issue during current state analysis that may consume about 20% of the estimated project effort. How should the business analyst (BA) handle the situation?
A business analyst (BA) held a formal walk through of requirements developed on a project. Stakeholders expressed concerns because they had different interpretations of the requirements. What activity would help ensure a common understanding?
During a lesson learned session, stakeholders had a heated discussion on the performance measures being employed and why they are necessary. The business analyst (BA) explained that performance measures are required to:
A business analyst (BA) is in the process of specifying the confirmed results of a requirements elicitation workshop. Which of the following help to ensure that the correct information about the requirements is provided to the participants?
A company has bought a customizable software product and the vendor's business analyst (BA) is visiting the company's office to perform a requirements assessment. The business sponsor expresses an interest in improving a specific process that is in scope. What should the BA do?
An organization is planning to launch an exciting new service that has never been offered before. The expectations are that the service will be extremely popular with young families but, because the organization wants to keep it a secret until launch day. there is no way of knowing whether this is correct. Why does the business analyst (BA) suggest identifying high customer demand by young families as an "assumption?
A business analyst (BA) is designing solutions for a set of requirements and finds that there is an opportunity to improve the operations of the business. Which of the following is an opportunity for improvement the BA could recommend?
A project has experienced several schedule delays. A business analyst (BA) is assigned to the project to help get it back on track. The project manager believes that incomplete requirements are causing the missed milestones. What tool will help address the project manager's concern?
A business owner has marked certain requirements as high priority for the upcoming release. After performing some analysis, the project team concluded that some of these requirements are not actually high priority and can be implemented in later releases. How should the project team proceed with prioritizing requirements?
A survey on a new system was conducted after the chief executive officer (CEO), who is also the project sponsor, expressed concerns about the uptake of the new system. The CEO is neither sure that the concerns are valid nor whether the survey was conclusive about the success of the project. The business analyst (BA) has been tasked to address the concerns expressed by the CEO and evaluate the results of the survey. What must the BA do to determine that the system is performing as intended and address the concerns of the CEO?
An organization is engaged in an effort to streamline the online customer experience. The business analyst (BA) prepares a business analysis information package to discuss the changes the customer will experience. Which one of the following tools will assist the BA in this discussion?
The business analyst (BA) is analyzing the formal relationships between people working in the enterprise. Which technique will the BA use to perform this task?
A business analyst (BA) is planning the traceability approach for a project. Why should the BA conduct this planning activity?
System designers are working with a business analyst (BA) during the initial stages of a project to implement a new transaction-based system. The system designers would like to have a visual that illustrates the type of information that will be input into the system, the processes it will support, and the location where it will be stored. What type of diagram meets the designers' needs?
The business analyst (BA) has an item logged in the action items register requiring the verification of forthcoming legislation in the next three months that might impact the proposed architecture. What should the BA do next?
A software company wants to make a gradual change from its traditional way of developing requirements to a more adaptive approach. A business analyst (BA) is hired to quantify the probability that the solution will meet the company’s needs and assess the relevant risks. Which element of risk assessment does the BA need to consider?
A business analyst (BA) has elicited the following requirement: "The solution must ensure the portal response times are under 2 seconds." What requirement classification schema does this requirement belong to?
Market studies projected a 28% year-over-year growth for five (5) years for commercial vehicle loans. A company that provides lending for commercial vehicles wanted to keep up with industrydemand; however, their applications were not capable of scaling to the increased demand for loan processing and billing. The company is deploying a new system to meet the demand. The project started five (5) years ago and cost $2 million USD. The project metrics are to be evaluated after five (5) years. The return on investment (ROI) for the project is calculated at 11%. The project sponsors are upset that the desired ROI for the project was not met. What was the root cause of this issue?
The director of a furniture store manages a group of skilled carpenters who make furniture from locally available materials. The director decides to automate its inventory processes so that the carpenters can place orders for raw materials themselves. A business analyst (BA) is engaged to define the requirements and propose options for commercial off-the-shelf (COTS) inventory management solutions. After meeting with the director, the BA needs to schedule a workshop with the carpenters to:
A business analyst (BA) is developing requirements for a project with a limited budget. The business owner will be prioritizing requirements so that low-value requirements can be de-scoped and the project remains within budget. Which of the following should the BA take into account to facilitate prioritization and ensure business objectives are met?
A senior manager wants to know at what stage the business analyst (BA) is with the requirements management process. The BA immediately sends a 100-page document with models and business rules to all stakeholders. Which best practice did the BA violate in this situation?
A company wants to increase its market share in the industry, and its Board has prioritized capabilities that need to be implemented to achieve the goal. The business requirements for the top priority were signed off, and the solution design has been completed. Due to technical constraints, it is not feasible to implement all the requirements at the same time. What must the business analyst (BA) do to deal with this situation?
A business analyst (BA) is managing stakeholder collaboration to ensure positive reactions are capitalized upon. There is uncertainty as to whether the correct stakeholders have been identified. Which technique can be used to correct this situation?
An organization has identified a market opportunity that could result in significant business gains. A business analyst (BA) is asked to assist in building the new business model. The BA begins by analyzing the current state. What input is critical to the current state analysis?
A business analyst (BA) has spent the week conducting work sessions with key stakeholders. Together, they have been reviewing user requirements and high-level design flowcharts to ensure that they have been correctly defined and documented. Which of the following describes the purpose of their work?
The business analyst (BA) is investigating techniques that would be appropriate for determining how and who uses data across the identified processes. Which technique should the BA select?
A business analyst (BA) is preparing the elicitation activity plan for a project. How will understanding the elicitation assist the BA with the elicitation activity?
A company has bought a customizable software product, and the vendor's business analyst (BA) is visiting the company's office to perform a requirements assessment. The business sponsor expresses an interest in improving a specific process that is in scope. What should the BA do?
A business analyst (BA) is working on a project involving the purchase of a commercial off-the-shelf (COTS) product. All internal risks have been identified and assessed. What is the BA's next course of action?
A business analyst (BA) has executed the last planned workshop in a series in order to verify requirements. All issues have been logged in an issues register. What technique is used to manage and resolve the outstanding issues?
A business analyst (BA) is in the process of specifying the confirmed results of a requirements elicitation workshop. Which of the following helps ensure that the correct information about the requirements is provided to the participants?
A business analyst (BA) is facilitating a meeting with subject matter experts (SMEs) in which the SMEs are answering questions about the major business processes and associated activities the business performs. The BA will create a deliverable from this discussion that will assist in defining scope. What technique is the BA using?
A project manager asks a business analyst (BA) to conduct a meeting to walk the stakeholders through how requirements are structured. Which of the following requirement viewpoints will help the BA provide that information?
A project is being initiated to create new financial reports for the accounting department, and the accountants have a wide range of views as to what would serve them best. What should the business analyst (BA) do to develop the correct set of requirements?
A recent survey shows that a newly implemented system has features that the users have never used. Upon reviewing the survey report, the Chief Executive Officer (CEO) highlighted that the company must avoid future implementations with functionality that does not provide any business value. What must the business analyst (BA) do to ensure future requirements meet a business need?
The Business Requirements Document (BRD) prepared by the business analyst (BA) was circulated to stakeholders for approval. Some stakeholders objected to the Use Case diagrams and could not understand them. Why would these be included in the document?
A business analyst (BA) is currently verifying the accuracy and consistency of information obtained from the stakeholders. The BA needs to identify additional information. What should the BA do next?
The business analyst (BA) has documented the requirements for a new system and is preparing the requirements for approval. Which of the following helps ensure that requirements are fully understood and traceable?
A business analyst (BA) needs to obtain agreement on and approval of requirements for a software solution. In order for this task to proceed, what does the BA need to understand?
A business analyst (BA) is tasked with designing a method of ensuring that the requirements captured during the elicitation sessions satisfy the needs and expectations of the customer experience, within an initiative. The BA identifies a way that the stakeholder requirements can be structured to ensure realization of the desired customer experience. Which viewpoint describes the approach taken by the BA to structure the requirements?
A business analyst (BA) begins to suspect that the ongoing elicitation activities with stakeholders are not delivering the quality of business analysis information required due to a lack of stakeholder participation. What type of technique can the BA adopt to resolve this type of issue?
A business analyst (BA) has documented the components of an information technology (IT) library, in preparation for establishing a consolidated catalogue of IT services. When interviewed, several of the IT managers indicated they already have a catalogue, and have no additional information to provide. What activity is necessary to support the project?
A business analyst (BA) is defining a stakeholder approval approach for the requirement deliverables. The project involves implementing new government regulatory requirements with significant risk to the organization in case of non-compliance. According to the BABOK ® GUIDE, what will the BA need to do?
A banking giant recently found a major security loophole in their online banking platform that could expose customer information. Security experts and the business analyst (BA) develop a low cost, low effort emergency fix to address this issue. What factor should the BA use to convince the bank to move forward with the emergency fix?
A business analyst (BA) is creating a business process model (BPM) showing how the organization will handle errors reported on its website. The BA held a workshop with stakeholders about how the process might work. The BA was also given an instruction manual about a similar error-handling situation, but was advised that some minor aspects are not applicable to the new process. How can the BA use the manual?
A business analyst (BA) creates several use case scenarios to specify the requirements for a system. When the beta version of the system is released, there are problems because several important pieces of information are missing. What should the BA have done to avoid this situation?
There are competing needs from the different business areas that will use a new system. The business analyst (BA) sets up a weekly meeting with a structured agenda to review the total effort, cost, business impact and risk of each requirement with the business leads to determine what is included in each release of the solution. What approach has the BA defined?
A client wants to rehire a business analysis consulting firm for another project. The assigned business analyst (BA) developed a good rapport with the stakeholders, but delivered documents that contained lots of technical jargon that the client could not fully understand. Based on the feedback, the consulting company should:
A business analyst (BA) has discovered an old checklist prepared for another initiative, which includes the following characteristics: Complete, Feasible, Unambiguous, Testable. What is the purpose of this checklist?
A business analyst (BA) is compiling information about different approaches that will meet solution
requirements in order to make a recommendation for solution design. To evaluate whether externally available solutions meet the requirements, which of the following will the BA create and distribute?
A business analyst (BA) is measuring solution performance of a new system. What should the BA consider to avoid skewed results and an inaccurate conclusion?
The business analyst (BA) has prepared a requirements package and it is now ready to present to the stakeholders. What is the purpose of presenting the package?
As a business analyst, you should work to identify opportunities to improve the operations of your organization. Which one of the following improvement opportunities aims to improve the experience of the customer?
When a business analyst prepares for elicitation, he must define the scope of the selected elicitation
technique, notify the stakeholders of the elicitation plan and technique to be used, and what other preparation activity?
Which one of the following business analysis techniques for analyzing business goals converts the business goals into achievable objectives and measures?
You are the business analyst for your organization. You are currently identifying opportunities for a customer to improve their business processes. The customer wants to streamline their business efforts either through new technologies, better processes, or a combination of both. The customer demands, however, that the solution should not cost more than $300,000 to implement and support for one year. What does the $300,000 represent?
When a business analyst performs requirements tracing, he may need to trace the requirements backward through their lineage and may need to trace the requirements forward through their relationship to other requirements. What is the backwards tracing activity called in requirements traceability?
A business analyst needs to prepare the requirements package for her endeavor in a predefined template for her company. What term can be assigned to this standardized template for packaging the requirements?
When a business analyst hosts a structured walkthrough of the requirements, what should the walkthrough always include at the beginning of the process?
A business analyst wants to elicit requirements from a large group of stakeholders. One of her primary goals of this event is to produce a broad set of options for solutions. Which elicitation technique would you recommend for this business analyst?
Business needs do not always originate from the business analyst or from business owners. There are several stakeholders which may identify or contribute to the identification of a business need. Which one of the following stakeholders are most likely to have the most direct awareness of problems that could lead to a business need?
Which business analysis task in the requirements management and communication domain is best described as creating and maintaining relationships among business objectives, requirements, team deliverables, and solution components to support business analysis activities?
You are the business analyst for your organization and you've identified a business need. In order to satisfy this business need, you believe that your organization will need to hire three electrical engineers, purchase equipment, and likely provide training to existing resources. What process is being described in this scenario?
You are the business analyst for your organization and you and your staff are creating as many solutions as possible to an identified problem in the solution approach process. What is this activity element called?
You have identified a task in your task list that cannot be completed until the inspector for the project signs off on the initial deliverables. The inspector's signoff on the initial deliverables is called what?
Before requirements can actually be approved to be managed, what must be true about the requirements?
You are the business analyst for a large project that will create new software for the entire organization. This new software will affect all of the administrative assistants in the organization schedule meetings, reserve facilities, and share calendars. There are approximately 2,400administrative assistants in your organization and not all of these people can attend requirements gathering workshops. What approach can you use to manage and gather requirements from these 2,400 administrative assistants?
You are creating the solution scope for an identified problem in your organization. You are working with several stakeholders during this process including the domain subject matter expert, the implementation subject matter expert, the project manager, and the sponsor. Which of these stakeholders will be responsible for writing the project scope?
You are the business analyst for a smaller project where there are few requirements. Management would still like you to create a method to trace the few requirements for this project. What type of matrix would be best in this instance?
You are the business analyst for your organization. You are currently writing the business goals and objectives as part of the elements for the define business process. Which one of the following statements best describes the business goals and objectives element?
You are the business analyst for your organization. You are currently working with Steve on the organize requirements process. You and Steve have elected to use the user stories approach for this process. What is the user stories approach for requirements organization?
When an organization implements a new solution, the organization will often have to provide dual-support for the new solution and the solution that's being replaced. Which one of the following is not an input to the transitional requirements definition?
An organization has selected a solution for a business need and the business analyst has elected to use the time boxing/budgeting technique for requirements prioritization. What is the time boxing/budgeting technique?
Beth is the business analyst for her organization and she's creating a data dictionary for her organization. All of the following information should be included in the data dictionary for an endeavor Beth is leading except for which one?
You are the business analyst for your organization and you are completing the manage requirements traceability process. You are tracking the requirements to determine how the requirements are interrelated with one another and with the actual delivery of the project scope.
There are actually three reasons why the business analyst should trace requirements. Which one of the following is not one of the three reasons why trace requirements are useful?
A business analyst (BA) is working on a complex project involving many stakeholders for which the business case has been previously completed and signed off. After an organizational restructure, new stakeholders have been assigned to the project working group, but do not see the value in the project outcomes and refuse to collaborate. What is a guideline or tool the BA can use to focus stakeholders on a common goal?
The business analyst (BA) assigned to support a legacy system has developed a customer survey to assess its usability. Before distributing the survey, what should the BA do?
The Business Requirements Document (BRD) prepared by the business analyst (BA) was circulated to stakeholders for approval. Some stakeholders objected to the Use Case diagrams and could not understand them. Why would these be included in the document?
A business analyst (BA) was asked to send the requirement details to the project manager (PM), director, vice president (VP), and Chief Information Officer (CIO). The BA shares the complete set of requirements to the PM and director, while creating a summarized version for the VP and CIO. Which aspect of requirement specification and modeling was the BA performing?
A lead business analyst (BA) analyzed the performance of all BA's within the organization. How should the BA approach communicating the results to stakeholders?
The business analyst (BA) recommended a new application be rolled out in phases. After reviewing alternatives, the project sponsor agreed. What does the BA expect to achieve by this approach?
During planning, elicitation, and sign off of requirements, the stakeholders felt that their opinions were not heard and information was not frequently shared. What major competency was lacking in this process?
A team of business analysts (BAs) identified policies that dictate how the organization grants paid time off for its employees and the associated business rules. What is this team of BAs trying to do?
A certain stakeholder requirement has been analyzed and broken down into several solution requirements, each affecting a different IT system. After solution design, the business analyst (BA) receives feedback that
one of the IT systems will take longer than anticipated to implement. What requirements artifact or technique will assist the BA in better understanding the related requirements?
A business analyst (BA) is reviewing the elicitation results of several workshops in order to decide which technique to use to model the requirements. The elicitation identified user roles needed in a future solution, the functionality needed by each of these roles, and how the desired interaction with the solution should look.
Which technique allows the BA to model this type of information?
Two stakeholders are arguing over which model to use for requirements. One insists that using an activity diagram is superior, while the other prefers a state diagram. How should the business analyst (BA) resolve the conflict?
A business analyst (BA) is working on a project to revise the way a company bills its customers. At the end of the project, the BA creates the following matrix:
Performance measures have been collected and analyzed by a business analyst (BA) to evaluate a solution that was launched a few years ago; however, the performance measures do not indicatewhether or not the solution is contributing to the desired value. What is the recommended next step?
A lead business analyst (BA) has received negative feedback on the deliverables produced by BAs in the organization. A major concern was ambiguous requirements. What technique will help ensure business analysis information is clear and understandable?
A business analyst (BA) held a formal walkthrough of requirements developed on a project. Stakeholders expressed concerns because they had different interpretations of the requirements. What activity would help ensure a common understanding?
A business analyst (BA) conducted a requirements elicitation session with project stakeholders and communicated the results. The project sponsor expressed concern with certain requirements that address the federal government legislation. What must the BA do to address the concern of the project sponsor?
Stakeholder requirements were approved for a business process reengineering initiative along with the creation of a roadmap. Due to market conditions, the product roadmap is modified to move the default process to the next iteration. What should the business analyst (BA) update in the stakeholder requirements?
A business analyst (BA) is defining a stakeholder approval approach for the requirement deliverables. The project involves implementing new government regulatory requirements with significant risk to the organization in case of non-compliance. According to the BABOK® Guide, what will the BA need to do?
A business analyst (BA) spent three months eliciting, specifying, and modeling the detailed stakeholder and solution requirements. Right before requirement sign-off, the BA realized that the Vice President was unable to approve the requirements and the Chief Financial Officer should do so. What element of requirement approval did the BA miss?
A business analyst (BA) is working on a project for a media company. The BA has verified, validated, and prioritized the requirements based on business benefits. During the development phase, the team discovered that the current viewer will no longer be supported by the provider. The technical team needs to either upgrade to the newer version with different features or find an alternate viewer. Given this new information, what is the next step for the BA?
A global organization is implementing a new Knowledge Management System, and communication to the different regions has been informal. The approach is to convert the few remaining regions iteratively. The team has experienced variances at this point but feels confident in these final conversions. How should the business analyst (BA) communicate the information?
The business analyst (BA) has scheduled an informal review of audit requirements with the compliance officer. The BA wants to demonstrate that the requirements collectively support one another, so they begin by reviewing the:
A business analyst (BA) has been tasked with examining and analyzing the relationship between a set of requirements by verifying that they are unambiguous. What will the BA be looking for?
A business analyst (BA) develops a template to document the product feature requirements for an enterprise software solution. Within the template, the BA includes the following additional information: source, priority level, level of complexity, and last modified date. What does the additional information describe?
A business analyst (BA) is managing stakeholder collaboration to ensure positive reactions are capitalized upon. There is uncertainty as to whether the correct stakeholders have been identified. Which technique can be used to correct this situation?
A business analyst (BA) asked two stakeholders with approval authority to approve the requirements. The stakeholders are being asked to confirm that:
A general insurance company wants to enter a new segment that has the potential for high profit and little competition. The business analyst (BA) was asked to prepare a presentation for key stakeholders to show how the new segment will deliver value for stakeholders. Which of the following is best suited for this purpose?
A project team needs to maintain the traceability of requirements for a software system. Due to the large number of requirements, which of the following methods should the team use?
A key stakeholder has requested an extensive range of performance measures for a replacement workflow system. A business analyst (BA) has decided to work closely with the stakeholder to validate the performance measures requested. The BA will be ensuring that the performance measures:
A business analyst (BA) is working on an effort to upgrade a system to take advantage of new technology. Most of the end users with the business knowledge and IT staff with technical knowledge of the system are no longer with the company. What can the BA evaluate to better understand the extent of the effort?
A business analyst (BA) is working on a project to improve product delivery. The issues arise during the latter stages of the delivery Freecycle and are due to poor communication of the business analysis information from the elicitation phase. As a result, a BA has ensured that the testing and training teams are identified as stakeholders on the RACI Matrix going forward. To which RAG designation should the training and testing teams be added?
A lead business analyst (BA) has received negative feedback on the deliverables produced by BAs in the organization. A major concern was ambiguous requirements. What technique will help ensure business analysis information is clear and understandable?
A business analyst (BA) is working on a project that has a number of stakeholder conflicts and issues. The BA is finding it difficult to resolve the conflicts and issues effectively. What should the BA do to prevent a similar situation in the future?
Stakeholders initially agreed to an implementation schedule for a set of reports based on the value to business users. The development team provided a detailed estimate of the time required to develop each report based on the business requirements. What should the business analyst (BA) and the stakeholders do with the estimates?
The human resources department of an organization needs a new report. The business analyst (BA) assigned to this effort has scheduled a requirements workshop with the users. Users from the legal department have also been invited to the workshop. As the BA sets up the workshop, what can be done in advance to ensure a productive and focused workshop?
A deployed loan product was funded with the expectation of prepayment risk reduction. Initially key performance indicators would be to take similar loan prepayment rates over the previous 10-year period and compare it with the new product. After implementation, the business analyst (BA) determines that the decade old housing market is vastly different. Which of the following should the BA consider for validity of performance measures?
A business analyst (BA) has recently joined a large consultancy firm where BAs are globally distributed on different assignments. Where would the BA find expectations for business analysis work as mandated by the consultancy firm?