Using an interest rate of 15%, an energy project has a net-present value (NPV) of $3,500. Which statement is true about the project's internal rate of return (IRR)?
You can buy air compressor A for $15,000 or air compressor B for $6,000. Compressor A will cost $10,000 per year to operate. Compressor B will cost $11,500 per year to operate. If both air compressors have a 10-year life and your required return on investment is 12%, which air compressor has the lowest total life-cycle cost?
A controlled valve is full closed when it gets a signal of 4 mA. The valve is full open when it gets a signal of 20 mA. With a control signal of 8 mA, what is the valve position?
A 3 MW rated wind-powered turbine has a rotor diameter of 113 meters. What is the efficiency of the wind turbine at rated power if it is operating in wind power calculated at 8.6 MW? Assume an air density of 1.225 kg/m³.
In a chilled water thermal energy storage system, chilled water is stored at 4°C and used for supply water. Chilled water return is 14°C. Calculate the storage capacity required to hold 50 GJ of thermal cooling. (The specific heat of water (C) is 4.2 kJ/kg-°C. Assume no system losses.)
A building has a 100 m² wall with an R-value of 14.4 (m²-C/W) in a climate with 3,500 heating degree days (HDD). The building heater is 85% efficient [based on the fuel's higher-heating value (HHV)]. The fuel cost is $5.00/GJ [based on the fuel's higher-heating value (HHV)]. What is the annual cost of the heat loss through the wall?
A 75-kW induction motor operates at 80% partial load and 88% efficiency. A new high-efficiency 75-kW motor can be installed that will operate at 95% efficiency (also at 80% partial load). What is the reduction in electric power demand?
At the end of a performance contract, who owns the equipment installed by the project?
Which of the following is NOT a typical benefit of performance contracting from the building owner's perspective?
A facility owner is considering installing a new chiller. The installed project cost will be $300,000. The annual savings from the energy-saving project will be $45,000 for the 20-year life of the chiller. If an energy-service company requires a minimum 20% return on investment (pre-tax), will the energy-service company agree to finance this project?
What is the best type of heat exchanger to recover and transfer latent heat energy from one air stream to another?
An energy-saving project costs $540,000. The project will have maintenance costs of $25,000 per year. The energy savings from the project are $160,000 per year. The project has a life of 10 years with no salvage value. The minimum attractive rate of return (MARR) is 10%. Using end-of-year cash flows, calculate the net-present value (NPV) of the project.
According to the institute of Electrical and Electronic Engineers (IEEE) standard 519. "Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems." the maximum total harmonic distortion (THD) for general low voltage systems less than 600 votts) should be:
SELECT THE CORRECT ANSWER
A 100-kW electrical load has a power factor of 75%. What capacitance, in KVAR, will improve the power factor to 95%?
An office building is illuminated with T8 fluorescent lamps. Which of the following is the best schedule for group relamping (total replacement of all the T8 fluorescent lamps in the building)?
Periodic commissioning of a building automation system (BAS) might include which of the following?
Which electric rate tariff would best cost justify a thermal energy storage (TES) system?
A three phase, 380-volt system, has the following voltage measurements:
Va = 375 volts
Vb = 380 volts
Vc = 391 volts
Calculate the percent voltage imbalance.
Insulation has a thermal conductivity of 0.04 Watt/(m-°C). What is the R-value for this insulation when it is 5-cm thick?
A motor operates with a normal and constant load. The electric current is measured to be 25% of the motor's nameplate rating. What does this mean?
Which of the following is NOT a renewable-energy resource?
SELECT THE CORRECT ANSWER
According to ISO 50001. when performing internal audits on the energy management system in an organization the internal auditor should do which of the following?
SELECT THE CORRECT ANSWER
A heat pump water heater has an annual average coefficient of performance (COP) of 2.1 and heats water from 15°C to 50°C. Hot water use is 100 liters per day, 365 days/yr. The electricity cost is $0.10/kWh. What is the annual water heating cost? (The specific heat of water (C) is 4.2 kJ/kg-°C.)
A 25-kW motor, at full load, drives a centrifugal fan that produces 160,000 liters per second (l/s) of ventilation air. If the fan speed is reduced to a flow rate of 150,000 l/s, what is the new load on the motor?
How can you tell if steam traps in a steam distribution system may NOT be working correctly?