Using an interest rate of 15%, an energy project has a net-present value (NPV) of $3,500. Which statement is true about the project's internal rate of return (IRR)?

Options:

A.

IRR < 0%

B.

IRR < 15%

C.

IRR = 15%

D.

IRR > 15%

Buy Now
Questions 5

You can buy air compressor A for $15,000 or air compressor B for $6,000. Compressor A will cost $10,000 per year to operate. Compressor B will cost $11,500 per year to operate. If both air compressors have a 10-year life and your required return on investment is 12%, which air compressor has the lowest total life-cycle cost?

Options:

A.

Compressor A

B.

Compressor B

C.

Both air compressors have the same life-cycle cost

Buy Now
Questions 6

A controlled valve is full closed when it gets a signal of 4 mA. The valve is full open when it gets a signal of 20 mA. With a control signal of 8 mA, what is the valve position?

Options:

A.

12.5% open

B.

25% open

C.

45% open

D.

75% open

E.

82% open

Buy Now
Questions 7

A 3 MW rated wind-powered turbine has a rotor diameter of 113 meters. What is the efficiency of the wind turbine at rated power if it is operating in wind power calculated at 8.6 MW? Assume an air density of 1.225 kg/m³.

Options:

A.

28.4%

B.

34.9%

C.

42.7%

D.

59.3%

Buy Now
Questions 8

How does an enthalpy-based economizer control operate?

Options:

A.

Using a constant mixed air proportion control sequence

B.

Comparing the difference in dry-bulb air temperature measurements of the return air and the outdoor air

C.

Measuring the outdoor air dry-bulb temperature and relative humidity

D.

Using the dry-bulb temperature and relative humidity of both the outdoor-air and return-air

Buy Now
Questions 9

Which of the following is/are benefits of commissioning?

Options:

A.

Ensures a system is designed to operate as intended

B.

Ensures a system is installed to operate as intended

C.

Ensures staff know how to operate a system as intended

D.

Ensures staff know how to maintain a system as intended

E.

All of the above

Buy Now
Questions 10

In a chilled water thermal energy storage system, chilled water is stored at 4°C and used for supply water. Chilled water return is 14°C. Calculate the storage capacity required to hold 50 GJ of thermal cooling. (The specific heat of water (C) is 4.2 kJ/kg-°C. Assume no system losses.)

Options:

A.

766 m³

B.

1,191 m³

C.

1,356 m³

D.

2,618 m³

E.

4,180 m³

Buy Now
Questions 11

A building has a 100 m² wall with an R-value of 14.4 (m²-C/W) in a climate with 3,500 heating degree days (HDD). The building heater is 85% efficient [based on the fuel's higher-heating value (HHV)]. The fuel cost is $5.00/GJ [based on the fuel's higher-heating value (HHV)]. What is the annual cost of the heat loss through the wall?

Options:

A.

$10.56/yr

B.

$12.35/yr

C.

$14.44/yr

D.

$16.22/yr

E.

$22.56/yr

Buy Now
Questions 12

A 75-kW induction motor operates at 80% partial load and 88% efficiency. A new high-efficiency 75-kW motor can be installed that will operate at 95% efficiency (also at 80% partial load). What is the reduction in electric power demand?

Options:

A.

1 kW

B.

2 kW

C.

4 kW

D.

5 kW

E.

8 kW

Buy Now
Questions 13

In a performance contract, which group has the greatest investment risk?

Options:

A.

The company installing the energy project

B.

The energy-service company

C.

The equipment manufacturer

D.

Risk is shared by the terms in the performance contract

Buy Now
Questions 14

What is the main reason for using instrumentation in energy audits?

Options:

A.

Save energy

B.

Determine energy flows

C.

Validate utility energy bills

D.

Support the local economy

Buy Now
Questions 15

At the end of a performance contract, who owns the equipment installed by the project?

Options:

A.

The bank

B.

The energy service company

C.

The equipment manufacturer

D.

The company that paid the contract payments

Buy Now
Questions 16

What is the purpose of monitoring energy consumption?

SELECT THE CORRECT ANSWER

Options:

A.

To establish a basis of management control

B.

To establish when and why there is a deviation in energy consumption patterns

C.

To support analysis of energy information

D.

All of the above

Buy Now
Questions 17

Which of the following is NOT a typical benefit of performance contracting from the building owner's perspective?

Options:

A.

Performance contracting is a simple and quick process

B.

Net cash flow can be neutral or positive for the owner

C.

The energy-service company can have a financial incentive to achieve projected savings

D.

Maintenance services provided by the performance contractor can add value to the overall savings achieved

E.

Performance contracting can provide access to external financing when the owner may not have sufficient equity for in-house financing for large projects

Buy Now
Questions 18

A facility owner is considering installing a new chiller. The installed project cost will be $300,000. The annual savings from the energy-saving project will be $45,000 for the 20-year life of the chiller. If an energy-service company requires a minimum 20% return on investment (pre-tax), will the energy-service company agree to finance this project?

Options:

A.

Yes

B.

No

Buy Now
Questions 19

What is the definition of lamp life for a fluorescent lamp?

Options:

A.

The time at which lamps begin to fail

B.

The time at which 50% of a large sample of lamps have failed

C.

The time at which 70% of a large sample of lamps have failed

D.

The time at which lumen output has reduced by 50%

E.

The time at which lumen output has reduced to 70% of the initial light output

Buy Now
Questions 20

What is the best type of heat exchanger to recover and transfer latent heat energy from one air stream to another?

Options:

A.

Heat pipe

B.

Shell and tube

C.

Ceramic recuperator

D.

Desiccant heat wheel

E.

Run-around system

Buy Now
Questions 21

An energy-saving project costs $540,000. The project will have maintenance costs of $25,000 per year. The energy savings from the project are $160,000 per year. The project has a life of 10 years with no salvage value. The minimum attractive rate of return (MARR) is 10%. Using end-of-year cash flows, calculate the net-present value (NPV) of the project.

Options:

A.

$154,657

B.

$289,575

C.

$311,556

D.

$456,254

Buy Now
Questions 22

According to the institute of Electrical and Electronic Engineers (IEEE) standard 519. "Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems." the maximum total harmonic distortion (THD) for general low voltage systems less than 600 votts) should be:

SELECT THE CORRECT ANSWER

Options:

A.

Less than 20%

B.

Less than 10%

C.

Less than 5%

D.

Less than 1%

E.

Greater than 1%

Buy Now
Questions 23

Which of the following best describes a dead band in controls?

Options:

A.

A range around a set point with no change in state even though there is a change in sensor input

B.

A system which changes the output of a controller based on how fast a variable is moving from or to a set point

C.

The delay in response of a system to a controlled change

D.

A value that has been assigned to a controlled variable

E.

The difference between a sensor variable and its set point

Buy Now
Questions 24

A 100-kW electrical load has a power factor of 75%. What capacitance, in KVAR, will improve the power factor to 95%?

Options:

A.

15.7 kVAR

B.

25.3 kVAR

C.

33.1 kVAR

D.

45.2 kVAR

E.

55.3 kVAR

Buy Now
Questions 25

Which of the following is a closed-loop controller?

Options:

A.

Time clock schedule controller

B.

Thermostat for an air conditioning unit

C.

Manual dimmer for a light switch

D.

Accelerator pedal in an automobile

Buy Now
Questions 26

An office building is illuminated with T8 fluorescent lamps. Which of the following is the best schedule for group relamping (total replacement of all the T8 fluorescent lamps in the building)?

Options:

A.

When you reach 70% of the rated lamp life

B.

Every 4 years

C.

When 25% of the lamps have failed

D.

When 20% of the ballasts have failed

E.

When the building owner changes

Buy Now
Questions 27

Periodic commissioning of a building automation system (BAS) might include which of the following?

Options:

A.

Removing temperature set point overrides

B.

Retraining staff on the BAS functions and programming

C.

Verify controls are still responsive to the BAS

D.

All of the above

E.

Answers A and C

Buy Now
Questions 28

Thermal scans of electrical equipment are useful for:

Options:

A.

Locating areas of high power factor

B.

Reading current carrying capacity of installed conductors

C.

Locating a loose electrical connection

D.

Measuring the load on a refrigerant system

Buy Now
Questions 29

Which electric rate tariff would best cost justify a thermal energy storage (TES) system?

Options:

A.

High electricity rate and low peak-demand rate

B.

Low electricity rate and low peak-demand rate

C.

Great differential between off-peak and on-peak time-of-use electricity rates

D.

Great differential between high season and low season electricity rates

E.

Great differential between high season and low season demand rates

Buy Now
Questions 30

A three phase, 380-volt system, has the following voltage measurements:

Va = 375 volts

Vb = 380 volts

Vc = 391 volts

Calculate the percent voltage imbalance.

Options:

A.

1.1%

B.

2.4%

C.

3.4%

D.

5.5%

E.

6.2%

Buy Now
Questions 31

Insulation has a thermal conductivity of 0.04 Watt/(m-°C). What is the R-value for this insulation when it is 5-cm thick?

Options:

A.

0.8 (m²-°C)/Watt

B.

1.25 (m²-°C)/Watt

C.

2.20 Watt/m²

D.

20 Watt/(m²-°C)

E.

20 (m²-°C)/Watt

Buy Now
Questions 32

A motor operates with a normal and constant load. The electric current is measured to be 25% of the motor's nameplate rating. What does this mean?

Options:

A.

The motor is operating at high efficiency

B.

The motor is oversized and may be downsized to increase efficiency

C.

The applied voltage is too low and should be increased to improve efficiency

D.

The applied voltage is too high and should be reduced to improve efficiency

Buy Now
Questions 33

What is a common method to reduce the impact of voltage imbalance?

Options:

A.

Rebalance single-phase loads

B.

Install harmonic filters

C.

Install capacitors to improve power factor on three-phase loads

D.

Reverse phase connections on three-phase motors

Buy Now
Questions 34

Which of the following is NOT a renewable-energy resource?

SELECT THE CORRECT ANSWER

Options:

A.

Saw grass

B.

Shale gas

C.

Geothermal heat

D.

Ocean waves

E.

Crop residue

Buy Now
Questions 35

According to ISO 50001. when performing internal audits on the energy management system in an organization the internal auditor should do which of the following?

SELECT THE CORRECT ANSWER

Options:

A.

Focus on the areas of significant energy use

B.

Review the written procedures related to the area under audit

C.

Assess actual activities as practiced against what the written procedures state

D.

Look for opportunities for energy improvement and to minimize bureaucracy inthe energy management system

E.

All of the above

Buy Now
Questions 36

A heat pump water heater has an annual average coefficient of performance (COP) of 2.1 and heats water from 15°C to 50°C. Hot water use is 100 liters per day, 365 days/yr. The electricity cost is $0.10/kWh. What is the annual water heating cost? (The specific heat of water (C) is 4.2 kJ/kg-°C.)

Options:

A.

$44.88/year

B.

$52.20/year

C.

$64.66/year

D.

$70.97/year

E.

$88.29/year

Buy Now
Questions 37

A 25-kW motor, at full load, drives a centrifugal fan that produces 160,000 liters per second (l/s) of ventilation air. If the fan speed is reduced to a flow rate of 150,000 l/s, what is the new load on the motor?

Options:

A.

15.2 kW

B.

20.6 kW

C.

24.2 kW

D.

25.0 kW

E.

30.3 kW

Buy Now
Questions 38

How can you tell if steam traps in a steam distribution system may NOT be working correctly?

Options:

A.

Robust flash steam rising from condensate receiver tank vent pipes

B.

An increase in make-up water requirements relative to steam demand

C.

Rapid chattering of disk steam traps

D.

No sound from inverted bucket steam traps

E.

All of the above

Buy Now
Questions 39

What is the main cause of low power factor?

Options:

A.

Harmonics

B.

Fluorescent lighting

C.

Solar flares

D.

Computers and electronic equipment

E.

Low-load induction motors

Buy Now
Exam Code: CEM
Exam Name: Certified Energy Manager (CEM)
Last Update: Apr 19, 2025
Questions: 130
CEM pdf

CEM PDF

$25.5  $84.99
CEM Engine

CEM Testing Engine

$30  $99.99
CEM PDF + Engine

CEM PDF + Testing Engine

$40.5  $134.99