Winter Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: geek65

CPIM-ECO Execution and Control of Operations Questions and Answers

Questions 4

In a work center that requires a large number of tooling changes, the best way to increase productivity is to:

Options:

A.

manage work center queue.

B.

optimize run time.

C.

reduce setup time.

D.

implement theory of constraints.

Buy Now
Questions 5

The primary value of a process map is to show:

Options:

A.

product routings between work centers.

B.

plant layout.

C.

material and operator movements.

D.

material and information flow.

Buy Now
Questions 6

Group technology identifies the common characteristics of parts on the basis of which of the following factors?

Options:

A.

Yields

B.

Processes

C.

Source

D.

Costs

Buy Now
Questions 7

Which of the following project characteristics would suggest using the PERT technique, rather than the critical path method?

Options:

A.

Estimates of individual task times are probabilistic.

B.

Project tasks are backward scheduled.

C.

Due dates are needed to identify critical tasks.

D.

Project management can determine the critical path.

Buy Now
Questions 8

A supplier of roller bearings makes lots of 10,000 and sorts them automatically according to size. In a typical lot of 10,000, the sizes break into the following categories:

{exhibit 1213}

The product requires rollers on target or, at most, 0.0001 oversize. Experience indicates that 100% must be reinspected before use because the machine inspection lets a few defective units slip through. The supplier should be encouraged to take which of the following actions?

Options:

A.

Learn what factors cause variability.

B.

Tighten the inspection criteria.

C.

Seek deviations from Quality Control.

D.

Doubly inspect the rollers

Buy Now
Questions 9

Which of the following applications is an effective use of electronic data interchange?

Options:

A.

Routing

B.

Price increase

C.

Advance shipment notice

D.

Returned material authorization

Buy Now
Questions 10

Which of the following outcomes is typical of employee engagement?

Options:

A.

Discretionary effort exerted towards improvement in quality

B.

Increase debate about company goals

C.

Decrease in hoshin planning activities

D.

Increase in kanban size of in-process inventories

Buy Now
Questions 11

Which of the following characteristics are found in a good quality management system?

Options:

A.

It covers a broad range of activities.

B.

It emphasizes sampling inspection.

C.

It relies on qualitative measurements.

D.

It reduces variability in the workplace.

Buy Now
Questions 12

When addressing the storage and movement of inventory in a push system, it would be important to consider:

Options:

A.

orders that are issued without regard for needs of other warehouses.

B.

projected requirements for all warehouses and direct sales.

C.

the need to increase warehouse levels of safety stock.

D.

elimination of central control of inventory allocation.

Buy Now
Questions 13

Which item is a role of the six sigma champion?

Options:

A.

Acting as an internal six sigma consultant

B.

Removing barriers the teams eccounter

C.

Providing technical support and mentoring

D.

Identifying possible causes of the problem

Buy Now
Questions 14

Which of the following terms describes a management technique used to evaluate planned changes to production processes?

Options:

A.

Analysis of variance

B.

Theory of constraints

C.

Design of experiments

D.

Design for manufacturability

Buy Now
Questions 15

Control charts are used to do which of the following?

Options:

A.

Determine preventative maintenance schedules

B.

Display variation of the production process

C.

Determine the percentage of output within specification limits

D.

Verify ongoing process capability

Buy Now
Exam Code: CPIM-ECO
Exam Name: Execution and Control of Operations
Last Update: Nov 21, 2024
Questions: 105
CPIM-ECO pdf

CPIM-ECO PDF

$28  $80
CPIM-ECO Engine

CPIM-ECO Testing Engine

$33.25  $95
CPIM-ECO PDF + Engine

CPIM-ECO PDF + Testing Engine

$45.5  $130