Halloween Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: clap70

DES-6322 Specialist - Implementation Engineer-VxRail Exam Questions and Answers

Questions 4

An implementation engineer is expanding an existing VxRail S Series cluster with an additional node. The version of the node is not at the current cluster level but is compatible.

What procedure would result in the quickest node addition?

Options:

A.

RASR Factory Image Upgrade

B.

Factory Reset

C.

VxRail Node Imaging Management

D.

Compute node expansion

Buy Now
Questions 5

Which VxRail model can only be installed with static rack rails?

Options:

A.

D Series

B.

P Series

C.

S Series

D.

G Series

Buy Now
Questions 6

An implementation engineer is configuring the network firewall to support a VxRail installation. Where can they find the necessary firewall rules?

Options:

A.

Network Validation Tool

B.

VxRail Configuration Portal

C.

As-Built Configuration Report

D.

Rack worksheet of the Network PEQ

Buy Now
Questions 7

What is a valid 2-node VxRail cluster configuration?

Options:

A.

2x 10 GbE and 2x 25 GbE in a switch configuration and external vCenter

B.

2x 1 GbE and 2x 10 GbE in a direct-connect configuration and external vCenter

C.

2x 1 GbE and 2x 10 GbE in a switch configuration and internal vCenter

D.

2x 10 GbE and 2x 25 GbE in a direct-connect configuration and internal vCenter

Buy Now
Questions 8

What is a valid 2-node VxRail cluster configuration?

Options:

A.

Series with 4x 25 GbE in a direct-connect configuration

B.

Series with 4x 10 GbE in a switch configuration

C.

Series with 4x 1 GbE in a direct-connect configuration

D.

Series with 2x 25 GbE in a switch configuration

Buy Now
Questions 9

A VxRail cluster 4.7.xxx environment is managed by the internal vCenter Server. An implementation engineer plans to deploy a new VxRail cluster using the existing vCenter Server instance, then use the

customer-supplied VDS to manage both VxRail clusters.

What must be done?

Options:

A.

Migrate the internal vCenter Server to an external vCenter Server, then merge the PSC

B.

Upgrade the VxRail version from 4.7.xxx to 7.0.000

C.

Migrate the internal vCenter Server to an external vCenter Server, then upgrade the VxRail 4.7.xxx to 7.0.100

D.

Upgrade the internal vCenter Server to version 7.0

Buy Now
Questions 10

An implementation engineer logs in to the vSphere Client of a recently deployed VxRail cluster. They want to review the firmware versions on the VxRail nodes.

Which view should they use to gather this information?

Options:

A.

Hosts and Clusters > VxRail Host > Configure > VxRail > iDRAC Configuration

B.

Host and Clusters > VxRail Host > Monitor > VxRail > Physical View

C.

Hosts and Clusters > VxRail Cluster > Monitor > VxRail > Appliances

D.

Hosts and Clusters > VxRail Cluster > Configure > VxRail > System

Buy Now
Questions 11

What is the correct sequence of steps to perform a RASR Factory Reset using an SD card?

Options:

Buy Now
Questions 12

A planned VxRail Stretched Cluster will have four All-Flash nodes at each site What is the recommended storage policy to ensure cross-site and local protection, using storage as efficiently as possible?

Options:

A.

Site disaster tolerance - None - keep data on Preferred (stretched cluster) Failures to tolerate - 1 failure - RAID-5 (Erasure Coding)

B.

Site disaster tolerance - Dual site mirroring (stretched cluster) Failures to tolerate - 1 failure - RAID-5 (Erasure Coding)

C.

Site disaster tolerance - Dual site mirroring (stretched cluster) Failures to tolerate - 1 failure - RAID-1 (Mirroring)

D.

Site disaster tolerance - Dual site mirroring (stretched cluster) Failures to tolerate - no data redundancy

Buy Now
Questions 13

Which command can be used from the VxRail Manager VM to restart the loudmouth daemon?

Options:

A.

systemctl restart loudmouth

B.

/usr/lib/vmware/loudmouth/bin/loudmouthd restart

C.

/etc/init.d/loudmouth restart

D.

systemctl restart vmware-loudmouth

Buy Now
Questions 14

What is a characteristic of the VxRail S Series node?

Options:

A.

Form factor of 2U4N

B.

Large form factor drives

C.

Dense Flash disks

D.

Form factor of 1U1N

Buy Now
Questions 15

A systems engineer is performing a VxRail upgrade in a VMware Horizon VDI cluster All hosts are put in Maintenance Mode.

What action does the engineer need to perform on each host once the upgrade has been completed?

Options:

A.

From the Connection Server run IcMaintcmd to delete the parent VMs and exit Maintenance Mode for each host

B.

From the Connection Server, run IcMaintcmd to take the hosts out of Maintenance Mode and reboot them

C.

Set the InstantClone Maintenance annotation value to the original value

D.

Set the InstantClone Maintenance annotation value to 2

Buy Now
Exam Code: DES-6322
Exam Name: Specialist - Implementation Engineer-VxRail Exam
Last Update: Oct 31, 2024
Questions: 105
DES-6322 pdf

DES-6322 PDF

$24  $80
DES-6322 Engine

DES-6322 Testing Engine

$28.5  $95
DES-6322 PDF + Engine

DES-6322 PDF + Testing Engine

$39  $130