Winter Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: geek65

H35-560 HCIA-LTE-RNP&RNO V1.0 Questions and Answers

Questions 4

Under the same coverage requirements, for the comparison between the adoption of f-band network and the adoption of d-band network, the number of stations required is;

Options:

A.

More

B.

Less

C.

Basically equivalent

D.

Difficult to evaluate

Buy Now
Questions 5

In the mobile communication system, what are the commonly used interference suppression methods? (multiple choice)

Options:

A.

Increase protective belt

B.

Apply to change frequency band

C.

Increase the isolation between antennas

D.

Install filter

Buy Now
Questions 6

High-end commercial buildings, airports, large venues, large shopping malls, high-end residential communities and other large traffic and VIP scenarios are suitable for co-deployment of MIMO solutions. What are the advantages of this solution? (Multiple choice)

Options:

A.

High capacity

B.

Can fully reflect the MIMO uplink and downlink capacity gain

C.

low cost

D.

project Low difficulty

Buy Now
Questions 7

Regarding the over-zone, overlapping coverage control, which of the following statements is wrong?

Options:

A.

Station height control: strictly control the station height to avoid over-zone interference

B.

Station spacing control: strictly avoid overlapping coverage sites within 100m

C.

Topological structure planning: the site distribution is as uniform as possible

D.

The angle of the sector in the station should be kept as close as possible to 60 degrees, direct sparring between stations can enhance coverage

Buy Now
Questions 8

Which of the following events is the basis for LTE synchronous frequency switching?

Options:

A.

A1

B.

A2

C.

A3

D.

B1

Buy Now
Questions 9

When doing PCI planning, what principles need to be met? (multiple choice)

Options:

A.

Avoid cells with overlapping coverage areaspcimold3same

B.

Of all the districtsPCIAll different

C.

Cells that meet the reuse degreePCICan be the same

D.

Need for cells with overlapping coverage areasPCImold3same

Buy Now
Questions 10

Which of the following descriptions are correct for cross-zone coverage? (Multiple choice)

Options:

A.

Over-area coverage may form "islands", leading to dropped calls

B.

Cross-area coverage may cause UE transmit power limitation, causing access failure

C.

Cross-area coverage may result in unbalanced load between the cross-covered base station and surrounding base stations, resulting in low resource utilization of surrounding base stations

D.

For LTE, cross-area coverage will not cause interference to its neighboring cells

Buy Now
Questions 11

What are the wireless indicators that need to be paid attention to during the drive test? (multiple choices)

Options:

A.

Up and Downmcs

B.

RSRP&RSRQ&RSSI&SINR

C.

BLER&rate

D.

Ec/Io

Buy Now
Questions 12

Single-site verification refers to the self-inspection and verification of the equipment functions and coverage capabilities of a single-site after the eNB hardware installation and debugging are completed.

Options:

A.

True

B.

False

Buy Now
Exam Code: H35-560
Exam Name: HCIA-LTE-RNP&RNO V1.0
Last Update: Nov 21, 2024
Questions: 84
H35-560 pdf

H35-560 PDF

$28  $80
H35-560 Engine

H35-560 Testing Engine

$33.25  $95
H35-560 PDF + Engine

H35-560 PDF + Testing Engine

$45.5  $130