Your customer has tested a new HCP G10 with an S10 node and they now want to re-install the S10 node before turning it into production.
What are three requirements? (Choose three.)
You are preparing to perform an offline upgrade on an HCP G10 and the pre-upgrade check procedure fails. The error message says that you do not have enough capacity on node 103 to perform the upgrade.
Which service procedure should you run to resolve this problem?
You are installing an HCP G10 and are setting up the BIOS.
What are two requirements when configuring in the BIOS? (Choose two.)
You are performing a six-drive upgrade of an HCP G10 with local storage.
Which two statements are true? (Choose two.)