Whichof the following innovation proposals is most likely to be successful to achieve Innovation,Option 1:Innovation?
Winch of the following are Included in the intent of Neighborhood Pattern and Design Credit. Local Food Production?
Which of thefollowing site conditions should be considered in the selection of renewable energy technologies for Green Infrastructure and Buildings Credit. Renewable Energy Production?
For Neighborhood Patternand Design Tree-Lined and Shaded Streetscapes Credit- Option 2 Shaded Sidewalks.what size ofnewly planted trees can be considered in calculating the percentage or shaded sidewalks?
The total area of all buildings on a project is 125,000 ft2 (11 612 m2). 63.750 ft2 (5.922 m2) of the project is within 1/2 mi (800 m) of 11 diverse uses and 106.240 ft2 (9.870 m2) of the project buildings are oriented for maximum solar orientation. What credit is the project eligible to achieve?
Winch of the following fixtures, fillings, or appliances Is outside the scope of water use reduction calculations in Green in Infrastructure and Buildings Credit. Indoor Water Use Reduction?
An undeveloped five acres (two hectare) site has a two-acre (0.8 hectare) area sloping al 50%. To achieve SmartLocation and Linkage Credit. Steep Slope Protection, what possible percentage ofthe site could be developed?
A project is pursuing Neighborhood Pattern and Design Credit. Local Food Production Restrictions in deeds or covenants, conditions, and restrictions (CC&Rs) may prohibit greenhouses in which location?
For a LEED forNeighborhood Development project thathas yet to earn all land use entitlements, which of thefollowing should the project team pursue to assist with local approvals?
A project team has arranged to use recycled infrastructure components. Thirty percent (30%) by mass ot the new material infrastructure components contain post-consumer recycled content. Ten percent (10%) by mass of the infrastructure is on-site reuse materials.
What Is the minimum additional percentage of recycled content (by mass) that must come from pre-consumer materials?
A square site with four equally sized neighboring parcels isbeing considered for a LEEDfor Neighborhood Development project.Consider the following: on the north side of the site is forest land; on the east side Is a church located on a parcel that is 100% developed: and on the south side is a schoollocated on a parcel that is 50% developed. Which one of the following uses on the west side would make this an infill site?
Which of thefollowing strategies comply with Neighborhood Pattern and Design Credit,Community Outreach and Involvement?
The LEED for Neighborhood DevelopmentRating System considers which ofthe following to be a circulation network?
A LEED forNeighborhood Development project is going to temporarily reroute existing transit service outside the required distances as pan or the construction process.The protect team has secured an agreement withthe transit agency to restore the rerouted service. What is the maximum number of years the service can be rerouted in order to quality tor Smart Location and Linkage Credit. Access to Quality Transit?
What is meant by "connectivity’’as used in the LEED for Neighborhood Development Rating System?
A project team has determined that achieving Green Infrastructure and Buildings Credit. Solar Orientation is feasible Based on a preliminary assessment of site features, sunlight and shading, themaximum solar access has been determined. What is the next step the project needs to take to incorporate optimum solar orientation into the site design?
Which location typewould earn the maximum points under the Smart Location and Linkage Credit. Preferred Locations Option 1: Location Type?
Which of the following strategies is a best practice for reducing a project's development footprint?
A project intends to connect to the municipal graywater system Toward which of the following can this connection contribute?
What can be omittedfrom the calculation verifying the percentage of reuse of buildings undergoing major renovation?
What Is the maximum distance from the project’s geographic center thata community garden outside the project boundary can be located in order to satisfy the requirement for Neighborhood Pattern and Design Credit,Local Food Production?
A)
B)
½ mi. (0.8 km)
C)
D)
A mixed-use development's total building area is 1.742.400 ft1 (161 874 m2) with 350 planned dwelling units Within a 1/2 mi. (08 km) walking distance are 20 diverse uses totaling 550.000 ft2 (51 096 m2) and 375 full-time jobs.
To achieve Smart Location and Linkage Credit. Housing and Jobs Proximity, what is the minimum areaof the residential component ofthe project?
A)
B)
C)
D)
A standardized base map that should be used throughout the submission to illustrate relevant surrounding features forup to 1 mi.(1.6 km) around the project boundary is a
The LEED for Neighborhood Development project learn is tabulating the potential number of points. What is the maximum number of points the team can earn through Regional Priority credits?
A project team has achieved the require men is for Neighborhood Pattern and Design Credit. Community Outreach and Involvement. Option 1: Community Outreach. Which of the following additional actions would earn the project a total or two points?
To achieve Neighborhood Pattern and Design Credit. Community Outreach and involvement. Option 1: Community Outreach during Preliminary Design, the project team must advertise and host at leastone community meeting. Which of thefollowing is an example ofa community meeting that is applicable towards this credit?
A project team would like to attempt the credit Transit Facilities' and is working with the local transit agency to inventory the existing and proposed bus stops within the project boundary. Oi the five proposed bus stops, one stop will be in operation at the same time when the project completes, and two stops will be in operation in the second year alter the project's completion. The remaining two bus stops will be in operation m me third year after the project's completion. How many proposed bus stops can the project team Include in the application form to attempt the credit?