Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: geek65

LEED-AP-ND LEED AP Neighborhood Development (LEED ND) Questions and Answers

Questions 4

Whichof the following innovation proposals is most likely to be successful to achieve Innovation,Option 1:Innovation?

Options:

A.

Including locked, Indoor bicycle storage for 100% of project occupants

B.

Being located next to a 20-mi. (32 Km), award-winning bicycle trail

C.

Distributing leaflets to project occupants about available public transit services nearby

D.

Providing an educational program on the environmental and human health benefits of green neighborhood

Buy Now
Questions 5

Winch of the following are Included in the intent of Neighborhood Pattern and Design Credit. Local Food Production?

Options:

A.

Improve nutrition

B.

Decrease use of genetically modified organisms

C.

Support walking and biking

D.

increase the variety of crop types in a region

Buy Now
Questions 6

Which of thefollowing site conditions should be considered in the selection of renewable energy technologies for Green Infrastructure and Buildings Credit. Renewable Energy Production?

Options:

A.

Wind exposure

B.

Distance from a wetland

C.

Annual precipitation levels

D.

Elevation above the 100-year flood plain

Buy Now
Questions 7

For Neighborhood Patternand Design Tree-Lined and Shaded Streetscapes Credit- Option 2 Shaded Sidewalks.what size ofnewly planted trees can be considered in calculating the percentage or shaded sidewalks?

Options:

A.

Crown diameter at time of purchase

B.

Crown diameter at time of planting

C.

Crown din motor five years after planling

D.

Crown diameter 10 years after planting

Buy Now
Questions 8

The total area of all buildings on a project is 125,000 ft2 (11 612 m2). 63.750 ft2 (5.922 m2) of the project is within 1/2 mi (800 m) of 11 diverse uses and 106.240 ft2 (9.870 m2) of the project buildings are oriented for maximum solar orientation. What credit is the project eligible to achieve?

Options:

A.

Neighborhood Pattern and Design Credit. Walkable Streets

B.

Green Infrastructure and Buildings Credit. Solar Orientation

C.

Neighborhood Pattern and Design Credit. Mixed-Use Neighborhoods

D.

Green infrastructure and Buildings Credit, optimize Building Energy Performance

Buy Now
Questions 9

Winch of the following fixtures, fillings, or appliances Is outside the scope of water use reduction calculations in Green in Infrastructure and Buildings Credit. Indoor Water Use Reduction?

Options:

A.

Residential shower head

B.

Commercial dishwashers

C.

Residential and commercial toilets

D.

Kitchen sink foucels

Buy Now
Questions 10

An undeveloped five acres (two hectare) site has a two-acre (0.8 hectare) area sloping al 50%. To achieve SmartLocation and Linkage Credit. Steep Slope Protection, what possible percentage ofthe site could be developed?

Options:

A.

50%

B.

65%

C.

75%

D.

90%

Buy Now
Questions 11

A project is pursuing Neighborhood Pattern and Design Credit. Local Food Production Restrictions in deeds or covenants, conditions, and restrictions (CC&Rs) may prohibit greenhouses in which location?

Options:

A.

Rooftops

B.

Back yards

C.

Side yard facing the circulation network

D.

Front yards facing the circulation network

Buy Now
Questions 12

For a LEED forNeighborhood Development project thathas yet to earn all land use entitlements, which of thefollowing should the project team pursue to assist with local approvals?

Options:

A.

Site visit by a GBCI representative

B.

Endorsement from local USGBC chapter

C.

LEED for Neighborhood Development: Plan. Letter of Support

D.

LEED Plaque

Buy Now
Questions 13

A project team has arranged to use recycled infrastructure components. Thirty percent (30%) by mass ot the new material infrastructure components contain post-consumer recycled content. Ten percent (10%) by mass of the infrastructure is on-site reuse materials.

What Is the minimum additional percentage of recycled content (by mass) that must come from pre-consumer materials?

Options:

A.

0%

B.

10%

C.

20%

D.

25%

Buy Now
Questions 14

A square site with four equally sized neighboring parcels isbeing considered for a LEEDfor Neighborhood Development project.Consider the following: on the north side of the site is forest land; on the east side Is a church located on a parcel that is 100% developed: and on the south side is a schoollocated on a parcel that is 50% developed. Which one of the following uses on the west side would make this an infill site?

Options:

A.

A parcel that is 100% farmland

B.

A library on a parcel that is 75% developed

C.

A market on a parcel that is 50% developed

D.

A post office on a parcel that is 25% developed

Buy Now
Questions 15

Which of thefollowing strategies comply with Neighborhood Pattern and Design Credit,Community Outreach and Involvement?

Options:

A.

Host a public hearing to solicit input after preliminary design

B.

Conduct a one day design charrette including property owners, residents, business owners and workers

C.

Establish ongoing communication channel between developer and community during the design and construction process

D.

Invite local businesses, residents and community planners and other stakeholder's to a meeting held at the siteto review the plan after it has been completed

Buy Now
Questions 16

The LEED for Neighborhood DevelopmentRating System considers which ofthe following to be a circulation network?

Options:

A.

Dedicated rights-of-way for fixed-rail transit service

B.

Entrance and exit ways for vehicular use into and out of parking lots or structures

C.

All motorizednon-motorized and mixed-mode travel ways permanently accessible in thepublic

D.

Spaces dedicated to non-motorized travel for project occupants to use for travel between buildings

Buy Now
Questions 17

A LEED forNeighborhood Development project is going to temporarily reroute existing transit service outside the required distances as pan or the construction process.The protect team has secured an agreement withthe transit agency to restore the rerouted service. What is the maximum number of years the service can be rerouted in order to quality tor Smart Location and Linkage Credit. Access to Quality Transit?

Options:

A.

One year

B.

Two years

C.

Three years

D.

Four years

Buy Now
Questions 18

What is meant by "connectivity’’as used in the LEED for Neighborhood Development Rating System?

Options:

A.

The on-site availability of public utilities.

B.

The opportunity of the Homeowners to meet and connect socially

C.

The number of publicly accessible street intersections pet square mile

D.

The availability of transit lines within walking distance of the geographic center of the project area

Buy Now
Questions 19

A project team has determined that achieving Green Infrastructure and Buildings Credit. Solar Orientation is feasible Based on a preliminary assessment of site features, sunlight and shading, themaximum solar access has been determined. What is the next step the project needs to take to incorporate optimum solar orientation into the site design?

Options:

A.

Determine whether each building can be designed within 15 degrees of geographical east-west

B.

Review local and federal tax incentives and incorporate the monetary value of incentives into the protect budget and site design

C.

Determine the total building square footage in the project and identify all buildings where one axis is at least 2.5 times longer than the others

D.

Study building envelopes and daylighting opportunities for planned development and adjust construction documents to reflect optimum solar orientation

Buy Now
Questions 20

Which location typewould earn the maximum points under the Smart Location and Linkage Credit. Preferred Locations Option 1: Location Type?

Options:

A.

An infill site that is not a previously developed site

B.

An infill site that is also a previously developed site

C.

An adjacent site that is also a previously developed site

D.

A previously developed site mat is not an adjacent site or infill site

Buy Now
Questions 21

Which of the following strategies is a best practice for reducing a project's development footprint?

Options:

A.

increase the amount of impervious area on-site

B.

Provide parking under or within a building structure

C.

Increase the number of cul-de-sacs throughout the site

D.

Implement a construction erosion and sedimentation control plan

Buy Now
Questions 22

A project intends to connect to the municipal graywater system Toward which of the following can this connection contribute?

Options:

A.

Green Infrastructure and Buildings Credit. Rainwater Management

B.

Green Infrastructure and Buildings Credit. Wastewater Management

C.

Green Infrastructure and Buildings Credit. Outdoor Water Use Reduction

D.

Green Infrastructure and Buildings Prerequisite. Indoor Water Use Reduction

Buy Now
Questions 23

What can be omittedfrom the calculation verifying the percentage of reuse of buildings undergoing major renovation?

Options:

A.

Roof decking

B.

Structural floor

C.

Exterior skin and framing

D.

Nonstructural roofing material

Buy Now
Questions 24

What Is the maximum distance from the project’s geographic center thata community garden outside the project boundary can be located in order to satisfy the requirement for Neighborhood Pattern and Design Credit,Local Food Production?

A)

B)

½ mi. (0.8 km)

C)

D)

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Buy Now
Questions 25

A mixed-use development's total building area is 1.742.400 ft1 (161 874 m2) with 350 planned dwelling units Within a 1/2 mi. (08 km) walking distance are 20 diverse uses totaling 550.000 ft2 (51 096 m2) and 375 full-time jobs.

To achieve Smart Location and Linkage Credit. Housing and Jobs Proximity, what is the minimum areaof the residential component ofthe project?

A)

B)

C)

D)

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Buy Now
Questions 26

A standardized base map that should be used throughout the submission to illustrate relevant surrounding features forup to 1 mi.(1.6 km) around the project boundary is a

Options:

A.

special map.

B.

permit map.

C.

vicinity map

D.

project site map.

Buy Now
Questions 27

The LEED for Neighborhood Development project learn is tabulating the potential number of points. What is the maximum number of points the team can earn through Regional Priority credits?

Options:

A.

Two points

B.

Four points

C.

Six points

D.

Eight points

Buy Now
Questions 28

A project team has achieved the require men is for Neighborhood Pattern and Design Credit. Community Outreach and Involvement. Option 1: Community Outreach. Which of the following additional actions would earn the project a total or two points?

Options:

A.

Conduct an Interactive workshop open to the public for at least two days

B.

Modify Die projects conceptual design as a direct result of community input

C.

Establish ongoing moans for communication between the developer and the community

D.

Obtain full entitlement and endorsements from the local land use and Building permitting jurisdictions

Buy Now
Questions 29

To achieve Neighborhood Pattern and Design Credit. Community Outreach and involvement. Option 1: Community Outreach during Preliminary Design, the project team must advertise and host at leastone community meeting. Which of thefollowing is an example ofa community meeting that is applicable towards this credit?

Options:

A.

City council meeting

B.

Open stakeholder meeting

C.

Zoning commission meeting

D.

Recurring citizen advisory meeting

Buy Now
Questions 30

A project team would like to attempt the credit Transit Facilities' and is working with the local transit agency to inventory the existing and proposed bus stops within the project boundary. Oi the five proposed bus stops, one stop will be in operation at the same time when the project completes, and two stops will be in operation in the second year alter the project's completion. The remaining two bus stops will be in operation m me third year after the project's completion. How many proposed bus stops can the project team Include in the application form to attempt the credit?

Options:

A.

One

B.

Two

C.

Three

D.

Five

Buy Now
Exam Code: LEED-AP-ND
Exam Name: LEED AP Neighborhood Development (LEED ND)
Last Update: Sep 17, 2024
Questions: 100
LEED-AP-ND pdf

LEED-AP-ND PDF

$28  $80
LEED-AP-ND Engine

LEED-AP-ND Testing Engine

$33.25  $95
LEED-AP-ND PDF + Engine

LEED-AP-ND PDF + Testing Engine

$45.5  $130