LEED-AP-O+M LEED AP Operations + Maintenance (LEED AP O+M) Questions and Answers

Questions 4

If a manufacturer does not specify the calibration interval for the utility meters used for benchmarking building energy performance, the assessment team may specify a reasonable calibration interval not to exceed

Options:

A.

one year

B.

two years

C.

three years

D.

five years

Buy Now
Questions 5

What must the project team do regardless of building type for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

Options:

A.

Compile meter data into daily and weekly summaries

B.

Use Labs21 Energy Benchmarking tool to calculate minimum energy performance

C.

Establish an ENERGY STAR® Portfolio Manager profile

D.

Benchmark building site energy data of at least three similar buildings

Buy Now
Questions 6

What is the allowed maximum tenant space exclusion for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

Options:

A.

10% of the vacant space

B.

10% of the gross floor area

C.

10% of the project site area

D.

10% of the regularly occupied area

Buy Now
Questions 7

Under what scenario must building visitors be surveyed for the Location and Transportation Credit, Alternative Transportation, Option 1?

Options:

A.

When the number of visitors reaches 10% the number of regular building occupants

B.

During the transportation survey period all visitors need to be invited to participate in the survey

C.

Every day no matter the number of visitors in relation to the number of regular building occupants

D.

When either the typical peak or daily average is greater than the number of regular building occupants

Buy Now
Questions 8

Rainwater harvesting can be used for which of the following credits or prerequisites?

Options:

A.

Water Efficiency Credit, Water Metering

B.

Water Efficiency Credit, Indoor Water Use Reduction

C.

Water Efficiency Prerequisite, Indoor Water Use Reduction

D.

Water Efficiency Prerequisite, Building-Level Water Metering

Buy Now
Questions 9

Which of the following appliances are included in Water Efficiency Prerequisite, Indoor Water Use Reduction?

Options:

A.

Residential dishwashers and coffee makers

B.

Residential clothes washers and dishwashers

C.

Residential dishwashers and drinking fountains

D.

Residential clothes washers and vending machines

Buy Now
Questions 10

Which strategies allow the project to achieve maximum points under Location and Transportation Credit, Alternative Transportation?

Options:

A.

Implement an alternative transportation program and conduct a transportation survey

B.

Conduct a week long observation of the parking lot usage and estimate the alternative transportation ate

C.

Conduct a transportation survey and demonstrate that the alternative transportation rate has been met

D.

Implement an alternative transportation program and estimate the alternative transportation rate

Buy Now
Questions 11

Under Energy and Atmosphere Credit, Optimize Energy Performance, for buildings eligible to receive an energy performance rating using the Environmental Protection Agency's ENERGY STAR® Portfolio Manager what is the minimum rating to receive points?

Options:

A.

50

B.

70

C.

76

D.

85

Buy Now
Questions 12

Which of the following strategies improves cooling tower water efficiency?

Options:

A.

Increase cooling tower fan speed

B.

Increase the cooling tower blowdown

C.

Install and maintain a conductivity meter

D.

Lower set point of water leaving cooling tower

Buy Now
Questions 13

Which product recycling requirement applies specifically to LEED AP® Operations and Maintenance Schools and Hospitality?

Options:

A.

Food

B.

Batteries and lamps

C.

Electric powered equipment

D.

Office equipment, appliances and audiovisual equipment

Buy Now
Questions 14

What is the diversion percentage of ongoing consumables in order to achieve exemplary performance as specified in Materials and Resources Credit, Solid Waste Management - Ongoing?

Options:

A.

50%

B.

75%

C.

85%

D.

90%

Buy Now
Questions 15

An office building has an average annual occupancy of 75% and 30,000 ft2 (2 787 m2) of completely vacant space.

How many occupants should be entered into Portfolio Manager for the vacant office space?

Options:

A.

Zero occupants

B.

100 occupants

C.

150 occupants

D.

200 occupants

Buy Now
Questions 16

Which of the following prerequisites or credits has a minimum occupancy requirement?

Options:

A.

Indoor Environmental Quality Credit, Daylight and Views

B.

Water Efficiency Prerequisite, Indoor Water Use Reduction

C.

Energy and Atmosphere Prerequisite, Minimum Energy Performance

D.

Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance

Buy Now
Questions 17

Which of the following strategies satisfy the Sustainable Sites Credit, Rainwater Management?\

Options:

A.

Perform the Small Storm Hydrology method to calculate the runoff volume on 95% of the site

B.

Minimize impervious cover to be maximum 80% of the site area for the 95th percentile of storm events with design alterations or verification

C.

Harvest and treat enough rainwater to cover 25% of the impervious surfaces, for the 95th percentile storm event, that otherwise would be lost in the sewage system or runoff the site

D.

Include rain gardens on the project site for 15% of the of the impervious surfaces, in order to absorb the 95th percentile storm event, that otherwise would be lost in the sewage system or runoff the site

Buy Now
Questions 18

Which of the following is a result of a low impact development rainwater management program?

Options:

A.

Treatment of and potential reuse of rainfall on site

B.

Incentive that impervious surface types be extensive

C.

Drainage of rainwater into a municipality drainage system

D.

Reduction of potential use of non-potable water in the project building

Buy Now
Questions 19

What calculation is used to achieve Materials and Resources Credit, Purchasing - Ongoing?

Options:

A.

Cost of compliant furniture

B.

Weight of compliant furniture

C.

Cost of both compliant and non-compliant furniture

D.

Weight of compliant and non-compliant furniture

Buy Now
Questions 20

For existing buildings pursuing LEED certification, the establishment period requirements include which of the following?

Options:

A.

Cooling Tower Weekly Meter Readings

B.

Site Management Policy

C.

Alternative Transportation Survey

D.

Occupant Comfort Survey

Buy Now
Questions 21

The Materials and Resources (MR) section includes which of the following building products in Credit calculations?

Options:

A.

Furniture

B.

Light Fixtures

C.

Plumbing Fixtures

D.

Mechanical Equipment

Buy Now
Questions 22

A LEED project is considering converting 75% of its existing composite roof to a vegetated roof. The project's landscape architect also suggests an open-grid pavement system for 30% of the site paving, and colored concrete for 25% of the site paving. Which of the following factors must be considered when selecting the materials for these strategies?

Options:

A.

The Solar Reflectance Index (SRI) of the colored concrete, and the unbound percentage of the open-grid pavement system

B.

The SRI of the vegetated roof system, and the unbound percentage of the open-grid pavement system

C.

The SRI of the vegetated roof system, and the SRI of the colored concrete

D.

The SRI of the colored concrete, and the SRI of the open-grid pavement system

Buy Now
Questions 23

The maximum number of points in the Innovation Category that can be achieved by exemplary performance is

Options:

A.

one point

B.

two points

C.

three points

D.

four points

Buy Now
Questions 24

Presuming all water fixtures meet the LEED Operations and Maintenance Rating System requirements, which of

the following statements is correct when considering baseline water usage in relation to water use?

Options:

A.

For a building with a certificate of occupancy dated 1993 or later, the baseline water usage is 120% of the water use

B.

For a building with a certificate of occupancy dated 1995 or later, the baseline water usage is 120% of the water use

C.

For a building with a certificate of occupancy dated 1993 or later, the baseline water usage is 150% of the water use

D.

For a building with a certificate of occupancy dated 1995 or later, the baseline water usage is 150% of the water use

Buy Now
Questions 25

When tracking waste data during the performance period for Materials and Resources Credit, Solid Waste Management - Ongoing, which strategy may be used to document total and diverted waste?

Options:

A.

Measure and document waste in weight or volume

B.

Use replacement value as the metric for ongoing waste

C.

Extrapolate data from one month of the performance period

D.

Do not allow tenant waste outside the building's waste program to be included

Buy Now
Questions 26

A building owner wishes to provide better Indoor Environmental Quality to the building occupants while containing capital costs. The LEED AP suggests pursuing Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2. Filtration. However, the existing HVAC system was not designed to accommodate the required filters but is otherwise efficient and operating well. Which strategy would enable credit achievement?

Options:

A.

Balance the existing HVAC system

B.

Increase fan capacity to maintain air delivery despite the added resistance

C.

Decrease fan capacity to maintain air delivery despite the added resistance

D.

Replace the existing HVAC system with an air handler that can accommodate the filters

Buy Now
Questions 27

How many months of metered energy use after occupancy are required to earn Energy and Atmosphere Prerequisite, Minimum Energy Performance?

Options:

A.

Three months

B.

Five months

C.

12 months

D.

13 months

Buy Now
Questions 28

Which of the following environmental concerns is exacerbated by impervious surfaces?

Options:

A.

Increase in light pollution

B.

Indoor Environmental Quality decreases

C.

Retention pond diminishment

D.

Contaminated runoff harming aquatic life

Buy Now
Questions 29

Which of the following strategies reduces the impact of materials used in building operation and maintenance on indoor air quality?

Options:

A.

Install VOC sensors

B.

Document all emissions

C.

Use products with low emissions

D.

Comply with ASHRAE 55-2010

Buy Now
Questions 30

Which of the following is considered an ongoing purchase for the purpose of calculating Materials and Resources

Credit, Solid Waste Management - Ongoing?

Options:

A.

Office chairs

B.

Mercury-containing lamps

C.

Shelving units

D.

Toner cartridges

Buy Now
Questions 31

Which of the following people are required to be listed on the LEED project registration page?

Options:

A.

Owner

B.

LEED AP

C.

Primary Architect

D.

Commissioning (Cx) agent

Buy Now
Questions 32

The project team is attempting to achieve Option 1. Lighting Controls in Indoor EnvironmentalQuality Credit, Interior Lighting. Which of the following is required documentation?

Options:

A.

Table of lighting controls installed

B.

Manufacturers' data for occupancy sensors

C.

The total area of the building square footage

D.

A photometric chart of the multi-occupant space

Buy Now
Questions 33

Which of the following parameters need to be continuously monitored for occupied spaces in order to qualify for Indoor Environmental Quality Credit, Thermal Comfort?

Options:

A.

Air temperature and humidity

B.

Air speed and radiant temperature

C.

Air temperature and energy consumption

D.

Radiant temperature and energy consumption

Buy Now
Questions 34

For Materials and Resources Credit, Purchasing - Lamps, the threshold for mercury-containing lamps is

Options:

A.

80 picograms per lumen hour for 90% of lamps

B.

90 picograms per lumen hour for 90% of lamps

C.

70 picograms per lumen hour for all mercury-containing lamps

D.

80 picograms per lumen hour for all mercury-containing lamps

Buy Now
Questions 35

What percentage of individual occupant spaces must have individual lighting controls in projects seeking Option 1.

Lighting Control in Indoor Environmental Quality Credit, Interior Lighting?

Options:

A.

40%

B.

50%

C.

60%

D.

70%

Buy Now
Questions 36

When conducting the Indoor Environmental Quality Credit, Occupant Comfort Survey what is the minimum percentage of building occupants that must respond?

Options:

A.

10%

B.

20%

C.

30%

D.

40%

Buy Now
Questions 37

Which refrigerant was phased out due to the Montreal Protocol?

Options:

A.

CFC-11

B.

HCFC-22

C.

HFC-134a

D.

HCFC-123

Buy Now
Questions 38

Which of the following prerequisites or credits have synergies with Materials and Resources Prerequisite, Facility Maintenance and Renovation Policy?

Options:

A.

Sustainable Sites Credit, Site Management

B.

Materials and Resources Credit, Purchasing - Lamps

C.

Energy and Atmosphere Prerequisite, Fundamental Refrigerant Management

D.

Indoor Environmental Quality Credit, Indoor Air Quality Management Program

Buy Now
Questions 39

Who needs to be surveyed for an in-patient hospital project for Location and Transportation Credit, Alternative Transportation: Option 1. Transportation Survey?

Options:

A.

People visiting patients

B.

Hospital employees

C.

Patients being released

D.

Pharmaceutical representatives

Buy Now
Questions 40

A LEED AP is reviewing construction documents to identify the regularly occupied spaces on a project to ensure that floor area values are utilized consistently across credits. What aspects of each space should the LEED AP consider?

Options:

A.

Rate of outdoor air provided per person

B.

Fire ratings of installed wall and ceiling assemblies

C.

Maximum number of intended occupants standing or seated

D.

Typical duration of intended occupancy in each space per day

Buy Now
Questions 41

Which of the following is a low impact development (LID) technique for rainwater management?

Options:

A.

Storm inlet

B.

Rain garden

C.

Detention basin

D.

Impervious pavement

Buy Now
Questions 42

Which of the followings operational elements need to be tracked only once during the performance period in order to meet the Sustainable Sites, Site Management Credit?

Options:

A.

Soil Testing

B.

Irrigation monitoring

C.

Fertilizer application

D.

Records of deicer use (if applicable)

Buy Now
Questions 43

Which of the following options about project boundaries is correct?

Options:

A.

The LEED project boundary may not include other buildings

B.

A LEED campus boundary for the master site is not necessary to pursue with LEED campus certification

C.

The gross floor area of the LEED project should be no less than 2% of the gross land area within the LEED project boundary

D.

Sites with a master plan for multiple buildings and/or phased development must not designate a LEED project boundary for each individual project

Buy Now
Questions 44

According to Indoor Environmental Quality Credit, Daylight and Quality Views, what is the view factor in the diagram below?

Options:

A.

View Factor 1

B.

View Factor 2

C.

View Factor 4

D.

View Factor 5

Buy Now
Questions 45

The WaterSense label or local equivalent requirement in Water Efficiency Prerequisite, Indoor Water Use Reduction

ensures that eligible newly installed plumbing fixtures will

Options:

A.

be advertised as LEED compliant

B.

be both water efficient and high performing

C.

comply with mandatory federal government regulations

D.

comply with all international plumbing system requirements

Buy Now
Questions 46

To determine possible credit compliance for Energy and Atmosphere Credit, Advanced Energy Metering, what information needs to be verified?

Options:

A.

That the meter data is remotely accessible

B.

That the meter is capable of storing data for at least 12 months

C.

That the meter(s) can be manually read

D.

That the meter(s) record data at a minimum of 15 minute intervals

Buy Now
Questions 47

Which of the following standards is applicable in order to comply with Indoor Environmental Quality Credit, Thermal Comfort?

Options:

A.

SCAQMD Rule #1168

B.

ASHRAE 55-2010

C.

ASHRAE 52.2-2007

D.

SCAQMD Rule #1113

Buy Now
Questions 48

What is the maximum length of time allowed for a gap in performance monitoring before needing to restart the performance period?

Options:

A.

One full week

B.

Two full weeks

C.

Three full weeks

D.

Four full weeks

Buy Now
Questions 49

What must the project team do in order to maximize the reduction in operational costs with regard to Sustainable Sites Credit, Site Improvement Plan?

Options:

A.

Reduce lawn areas

B.

Increase habitat diversity

C.

Increase green space for occupants

D.

Improve water quality of runoff from rainwater

Buy Now
Exam Code: LEED-AP-O+M
Exam Name: LEED AP Operations + Maintenance (LEED AP O+M)
Last Update: Nov 22, 2024
Questions: 166
LEED-AP-O+M pdf

LEED-AP-O+M PDF

$25.5  $84.99
LEED-AP-O+M Engine

LEED-AP-O+M Testing Engine

$30  $99.99
LEED-AP-O+M PDF + Engine

LEED-AP-O+M PDF + Testing Engine

$40.5  $134.99