If a manufacturer does not specify the calibration interval for the utility meters used for benchmarking building energy performance, the assessment team may specify a reasonable calibration interval not to exceed
What must the project team do regardless of building type for Energy and Atmosphere Prerequisite, Minimum Energy Performance?
What is the allowed maximum tenant space exclusion for Energy and Atmosphere Prerequisite, Minimum Energy Performance?
Under what scenario must building visitors be surveyed for the Location and Transportation Credit, Alternative Transportation, Option 1?
Rainwater harvesting can be used for which of the following credits or prerequisites?
Which of the following appliances are included in Water Efficiency Prerequisite, Indoor Water Use Reduction?
Which strategies allow the project to achieve maximum points under Location and Transportation Credit, Alternative Transportation?
Under Energy and Atmosphere Credit, Optimize Energy Performance, for buildings eligible to receive an energy performance rating using the Environmental Protection Agency's ENERGY STAR® Portfolio Manager what is the minimum rating to receive points?
Which product recycling requirement applies specifically to LEED AP® Operations and Maintenance Schools and Hospitality?
What is the diversion percentage of ongoing consumables in order to achieve exemplary performance as specified in Materials and Resources Credit, Solid Waste Management - Ongoing?
An office building has an average annual occupancy of 75% and 30,000 ft2 (2 787 m2) of completely vacant space.
How many occupants should be entered into Portfolio Manager for the vacant office space?
Which of the following prerequisites or credits has a minimum occupancy requirement?
Which of the following strategies satisfy the Sustainable Sites Credit, Rainwater Management?\
Which of the following is a result of a low impact development rainwater management program?
What calculation is used to achieve Materials and Resources Credit, Purchasing - Ongoing?
For existing buildings pursuing LEED certification, the establishment period requirements include which of the following?
The Materials and Resources (MR) section includes which of the following building products in Credit calculations?
A LEED project is considering converting 75% of its existing composite roof to a vegetated roof. The project's landscape architect also suggests an open-grid pavement system for 30% of the site paving, and colored concrete for 25% of the site paving. Which of the following factors must be considered when selecting the materials for these strategies?
The maximum number of points in the Innovation Category that can be achieved by exemplary performance is
Presuming all water fixtures meet the LEED Operations and Maintenance Rating System requirements, which of
the following statements is correct when considering baseline water usage in relation to water use?
When tracking waste data during the performance period for Materials and Resources Credit, Solid Waste Management - Ongoing, which strategy may be used to document total and diverted waste?
A building owner wishes to provide better Indoor Environmental Quality to the building occupants while containing capital costs. The LEED AP suggests pursuing Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2. Filtration. However, the existing HVAC system was not designed to accommodate the required filters but is otherwise efficient and operating well. Which strategy would enable credit achievement?
How many months of metered energy use after occupancy are required to earn Energy and Atmosphere Prerequisite, Minimum Energy Performance?
Which of the following environmental concerns is exacerbated by impervious surfaces?
Which of the following strategies reduces the impact of materials used in building operation and maintenance on indoor air quality?
Which of the following is considered an ongoing purchase for the purpose of calculating Materials and Resources
Credit, Solid Waste Management - Ongoing?
Which of the following people are required to be listed on the LEED project registration page?
The project team is attempting to achieve Option 1. Lighting Controls in Indoor EnvironmentalQuality Credit, Interior Lighting. Which of the following is required documentation?
Which of the following parameters need to be continuously monitored for occupied spaces in order to qualify for Indoor Environmental Quality Credit, Thermal Comfort?
For Materials and Resources Credit, Purchasing - Lamps, the threshold for mercury-containing lamps is
What percentage of individual occupant spaces must have individual lighting controls in projects seeking Option 1.
Lighting Control in Indoor Environmental Quality Credit, Interior Lighting?
When conducting the Indoor Environmental Quality Credit, Occupant Comfort Survey what is the minimum percentage of building occupants that must respond?
Which of the following prerequisites or credits have synergies with Materials and Resources Prerequisite, Facility Maintenance and Renovation Policy?
Who needs to be surveyed for an in-patient hospital project for Location and Transportation Credit, Alternative Transportation: Option 1. Transportation Survey?
A LEED AP is reviewing construction documents to identify the regularly occupied spaces on a project to ensure that floor area values are utilized consistently across credits. What aspects of each space should the LEED AP consider?
Which of the following is a low impact development (LID) technique for rainwater management?
Which of the followings operational elements need to be tracked only once during the performance period in order to meet the Sustainable Sites, Site Management Credit?
According to Indoor Environmental Quality Credit, Daylight and Quality Views, what is the view factor in the diagram below?
The WaterSense label or local equivalent requirement in Water Efficiency Prerequisite, Indoor Water Use Reduction
ensures that eligible newly installed plumbing fixtures will
To determine possible credit compliance for Energy and Atmosphere Credit, Advanced Energy Metering, what information needs to be verified?
Which of the following standards is applicable in order to comply with Indoor Environmental Quality Credit, Thermal Comfort?
What is the maximum length of time allowed for a gap in performance monitoring before needing to restart the performance period?
What must the project team do in order to maximize the reduction in operational costs with regard to Sustainable Sites Credit, Site Improvement Plan?