You need to resolve the production manager issue.
How should you configure manufacturing execution? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
You need to calculate estimated consumption of ingredients for liquid cleaning solution.
What is the consumption? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
You need to resolve the shop supervisor’s issue.
Which options should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
You need to configure lot number control for inventory. Which option should you use?
You need to configure production control parameters for liquid cleaning solution manufacturing.
What are two possible ways to achieve this goal? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
You need to configure production operations for the pine and orange scent solutions.
Which three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
You need to resolve the ModelT issue reported by the golf course manager.
Which two features should you configure? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
You need to implement the scheduled Kanban requirements.
Which rules should you use? To answer, drag the appropriate rules to the correct requirements. Each rule may be used once, more than once, or not at all. You may need to drag the spirt bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
You need to configure the reservation methods prototype production order as planned by the engineering team.
How should you configure the prototype production order? To answer, move the appropriate configurations to the correct requirements. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
You need to configure the production requirements for the QA team. What should you configure?
You need to configure the production requirements of the controller.
What should you configure? To answer, move the appropriate configurations to the correct requirements. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
You need to create the new summer limited edition bicycle in Dynamics 365 in preparation for taking orders.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
You need to determine the sales price for a new limited-edition bicycle for the summer season.
What should you do?
You need to configure the system to meet the requirements.
What should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to resolve the issue for UserB.
What are two possible ways to achieve this goal? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
You need to create the production orders for standard model bicycles.
Which method should you use?
You need to configure the bicycles’ production resource.
Which option should you use?
You need to set up the chocolate items.
Which values should you select? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to resolve the issue for UserC.
Which two options should you configure? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
You need to configure the system to track the cost and delivery performance of VendorZ.
Which two actions should you perform? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
You need to determine the batch values on the combined mix batches for OperatorA.
Which values should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to resolve the issue for UserG.
What should you do? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to configure the system for plastic operations.
Which two parts should be manually reported as finished? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
You need to resolve the issue for UserF.
What should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to set up the configuration model to price the motorcycles correctly. What should you do?
You need to set up the system to calculate the overhead rates automatically for production.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
You need to set up the metal production route and BOM.
Which three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
STION NO: 1
You need to create the constraint for the ML seat selection.
Which expression constraint should you use?
NO: 3 HOTSPOT
You need to configure system attributes.
Which attribute types should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to set up the state control for sales of motorcycles.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
You need to configure scheduling for each production area.
Which scheduling options should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
You are the product manager at an orange juice manufacturing company.
For every 1.000 pounds of orange juke, 20 pounds of orange pulp is created which can be sold or reused profitably. The cost is calculated as a weighted average between the quantity of orange juice that is reported as finished and the orange pulp based on the standard cost of each item.
You need to create the formula for orange juice that will produce orange pulp as a result of finishing a batch order.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
A beverage manufacturing company is implementing Dynamics 365 Supply Chain Management.
The company will use the batch balancing functionality to create the beverages.
IngredientA must be configured for a target value of 40 with a minimum of 35 and a maximum of 45. IngredientB must be configured to account for target value variances.
You need to configure the ingredient-based calculations
Which ingredient type should you configure for each requirement? To answer, drag the appropriate ingredient types to the correct requirements. Each ingredient type may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
A customer produces light projection toys for holiday decorations throughout the year. The production process creates the projection toy at the following work cells: stands, main assembly, electric, visuals, and packaging.
Vendors must create templates for each toy they produce each season. They must manage the transfer of templates to the warehouse. Each transfer for each vendor must use the same purchase agreement.
You need to configure the subcontracted transfer activity.
What should you do?
A pharmaceutical manufacturer uses Process manufacturing.
You are consolidating planned batch orders for a specific medication. The order must cover two weeks of demand. No other items need to be consolidated.
You need to change the coverage group of the items.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
A company produces pipe at certain fixed lengths.
The company must be able to schedule cutting machines. You set up the cutting machines as resources. AH cutting resources can produce many of the products. There are some products that require cutting machines that can produce longer lengths of product. Only some of the machines can do this.
You need to configure the resources to account for these different products.
What should you do?
A bicycle manufacturer uses Dynamics 365 Supply Chain Management.
The manufacturer experiences a supply chain issue with a metal used to fabricate the wheel. Due to the issue, the manufacturer must change the bicycle wheel assembly temporarily. Production workers require an interactive visual guide to complete production.
You need to configure the features.
Which features should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to meet the needs for the large teakwood furniture order.
What must you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to meet the substitution requirements for User4 and User5.
What must you configure? To answer, drag the appropriate configurations to the correct substitution requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
You need to configure the requirements for metal fabrication equipment maintenance. What must you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You must ensure that the firepit product is available for sale. How should the product be released?
You need to address the ignition switch issue.
Which three actions should you perform? Each answer presents part of the solution.
NOTE: Each correct selection is worth one point.
You need to enable the features and configuration keys for the firepits.
Which two features should you enable? Each answer presents part of the solution.
NOTE: Each correct selection is worth one point