Questions 4

A consultant is using the Foundation applet to create a cluster. During the process the consultant refreshes the progress bar web page and is concerned when nothing loads.

What should the consultant do to verify that Foundation has completed successfully?

Options:

A.

Return to the Foundation configuration page and start over.

B.

Update Java on the Foundation VM.

C.

Connect to any CVM IP address from a web browser.

D.

Restart the Foundation process.

Buy Now
Questions 5

A customer racks all nodes in the new cluster. The customer does not allow IPv6 for node discovery.

The consultant is not allowed to use the consultant’s own flat switch in the customer’s environment.

Which step should the consultant take to resolve this issue?

Options:

A.

Bare metal image all nodes with Foundation VM.

B.

Image each node individually with Foundation VM.

C.

Connect to the top of rack switch and discover the nodes with IPv4.

D.

Open a console to all nodes and statically assign IP addresses.

Buy Now
Questions 6

A consultant successfully installs the Foundation VM on a laptop and needs to ensure the VM can communicate externally.

Which two configuration changes should the consultant make next? (Choose two.)

Options:

A.

Ensure the vNIC is set to bridged adapter.

B.

Configure the static IP address through the desktop virtualization software.

C.

Open terminal and configure via ifconfig command.

D.

Run the set_foundation_ip_address application on the VM desktop.

Buy Now
Questions 7

After imaging the nodes and creating the cluster successfully, the consultant connects the cluster to the customer network. When logging into Prism, the events dashboard is full of errors.

What is causing the issue?

Options:

A.

The cluster was not stopped prior to connecting to the customer network.

B.

The Cluster Virtual IP Address (VIP) was not set up during the process.

C.

Foundation did not create the cluster successfully.

D.

The consultant did not run Nutanix Cluster Check (NCC..

Buy Now
Questions 8

After finishing foundation on an AHV cluster, a consultant is preparing to plug into the customer network given the following set of requirements:

* All network traffic on trunks is tagged

* Customer is using LACP

* A native VLAN is not in use

Which set of commands should the consultant use to ensure cluster connectivity on customer equipment?

Options:

A.

change_cvm_vlan 0

ovs-vsctl set port br0 tag=0

ovs-vsctl set port br0-up bond_mode=balance-tcp

B.

change_cvm_vlan 10

ovs-vsctl set port br0 tag=10

ovs-vsctl set port br0-up bond_mode=balance-tcp

C.

change_cvm_vlan 0

ovs~vsctl set port br0 tag=0

ovs~vsctl set port br0-up bond_mode=active-backup

D.

change_cvm_vlan 10

ovs-vsctl set port br0 tag=10

ovs-vsctl set port br0-up bond_mode=balance-slb

Buy Now
Questions 9

Which two components must be identified to validate that software compatibility requirements are met for Nutanix Cluster Installation? (Choose two.)

Options:

A.

Guest OS

B.

AOS

C.

Firmware

D.

Hypervisor

Buy Now
Questions 10

A consultant configures a Nutanix cluster and integrates the hosts into vCenter using VMware best practices. The customer has requested that the Nutanix cluster only have a single datastore.

Upon configuring the cluster per the customer requirements, vCenter displays an alert regarding the heartbeat datastore. The consultant adds the das.ignoreInsufficientHbDatastore value = true rule. The container can be seen from each host, but the alert remains active.

What should the consultant do to resolve this issue?

Options:

A.

Turn off and then turn back on HA.

B.

Make sure the DRS setting is turned on.

C.

Create a second container.

D.

Whitelist the vCenter IP address within Prism.

Buy Now
Questions 11

A consultant creates a Windows VM after installing a new Nutanix cluster running AHV. The consultant has statically assigned an IP address to the VM but it is unable to communicate on the network.

Which action should the consultant take to resolve this issue?

Options:

A.

Confirm that IPv6 is enabled on the guest VM.

B.

Confirm that the VM vNIC is tied to the correct VLAN in Prism Element.

C.

Mount and install the Nutanix Guest Tools.

D.

Set a Group Policy to make sure the Windows Firewall is disabled.

Buy Now
Exam Code: NCSC-Level-1
Exam Name: Nutanix Certified Services Consultant (NCSC): Level 1
Last Update: Nov 23, 2024
Questions: 78